Construction of a new 110kV electricity substation and associated control buildings.

SD12A/0048 · South Dublin County Council · Lodged 16 March 2012

Reference
SD12A/0048
Authority
South Dublin County Council
Register status
Decided
Type
Permission
Received
16 March 2012
Floor area
416 m²

Summary

AI-generated

The project involves constructing a new Gas Insulated Switchgear (GIS) 110kV electricity substation. Works include a concrete compound area, an ESB substation control building, a client control building, a transformer bay, and a 6m wide concrete access road.

Infrastructuresubstationinfrastructureutility

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Construct a new gis (gas insulated switchgear) 110kv electricity substation and to carry out ancillary site works: (1) all necessary site works for construction of a concrete compound area to the southwest of the existing adsil facility; (2) construction of an esb gis substation control building within the fenced compound area; (3) construction of a client control building and a transformer bay to house two transformers within the compound area; (4) construction of a 6m wide concrete access road within the perimeter of the site area; (5) installation of all substation apparatus within the compound area and buildings.

Land-use zoning

What this land is zoned for

EESI
To provide for enterprise and employment related uses

National zoning type: Industrial, enterprise, employment

Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
44 Bancroft Rd, Tallaght, Dublin 24Jan 2025€531,000251 m
7 Bancroft Downs, Tallaght, Dublin 24May 2026€465,000260 m
21 B�thair Bancroft, Tamhlacht, Baile �tha Cliath 24Apr 2025€600,000340 m
47 Bancroft Ave, Tallaght, DublinMar 2026€525,000406 m
36 Bancroft Park, Tallaght, Dublin 24Aug 2025€530,000416 m
75 Castle Park, Tallaght, Dublin 24Feb 2026€380,000437 m
8 Tymon North Green, Tymon North, Tallaght Dublin 24Oct 2025€395,000441 m
161 Castle Park, Tallaght, Dublin 24Jun 2026€330,000467 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received16 March 2012
  2. Decision due10 May 2012
  3. Decision issued9 May 2012
  4. Grant issued19 June 2012

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.