Planning Permission Ireland
GrantedCommercialDecided 22 September 2014

Millview Terrace and Tower Road, Clondlakin, Dublin 22

Construction of the Clondalkin Round Tower Visitors Centre and Public Gardens.

SD148/0003 · South Dublin County Council · Lodged 20 May 2014

Reference
SD148/0003
Authority
South Dublin County Council
Register status
In progress
Type
Application Under Part 8
Received
20 May 2014

Summary

AI-generated

This Part 8 application involves the conservation and refurbishment of several protected structures on Millview Terrace and Tower Road. It includes constructing a new building for a café, exhibition space, and toilets, alongside landscaping new public gardens adjacent to the Round Tower National Monument.

Commercialtourismconservationheritagepublic realm
Storeys
2
Floor area
695 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Construct the clondalkin round tower visitors centre and public gardens. Development of the visitors’ centre will consist of
  • Repair, conservation and refurbishment works to numbers 1, 2 and 3 millview terrace, clondalkin, dublin 22, protected structures, and
  • Repair, conservation and refurbishment works to num bers 15 and 16 tower road, clondalkin, dublin 22 for re-use as shops at ground floor level, and
  • The construction of a new building which will contain a café, exhibition space, toilets, a two storey stairs and lift extension to the rere of these five houses
  • Total area 695sq. M. , including: 450sq. M. At ground floor level, 245 sq. M. At first floor level external works and the public garden will include
  • New gardens with new landscaping within the existing walls, between these five houses and the round tower, a national monument and protected structure
  • Conservation and refurbishment of the existing cottage gardens in front of 1,2 and 3 millview terrace, protected structures, with new paving and landscaping to the front civic space. The works are proposed on a site which is protected under the national monuments acts 1930
  • 2004. The site is also within the clondalkin architectural conservation area. No works are proposed by this project to the round tower, a national monument and protected structure. Plans and drawings of the proposed development will be on public display at the following locations: south dublin county council, county hall, tallaght, dublin 24 (between the hours of 9:00am
  • 5:00pm monday to thursday and 9.00am
  • 4.30pm on friday); south dublin county council, civic offices, clondalkin, dublin 22 (between the hours of 9:00am
  • 5:00pm monday to thursday and 9.00am
  • 4.30pm on friday); clondalkin library, monastery road road, clondalkin, dublin 22 (during normal opening hours - inspection only) and on http://www. Sdcc. Ie during the period from tuesday, 20th may 2014 to 1st july 2014. Submissions or observations with respect to this matter dealing with the proper planning and sustainable development of the area in which the development would be situated may be made in writing to: the senior executive officer, community department, south dublin county council, county hall, tallaght, dublin
  • The latest date for the receipt of submissions or observations is 4.30pm on tuesday 15th july. Http://www. Sdublincoco. Ie/index. Aspx? Pageid=939&pid=29731

Land-use zoning

What this land is zoned for

OSOS
To preserve and provide for open space and recreational amenities

National zoning type: Open space, park

Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 27 May 2016. A completion certificate was lodged on 22 June 2017.

2 commencement notices are linked to this development.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Towerville, Tower Rd, Clondalkin Dublin 22Mar 2025€915,75744 m
St Laurence, Tower Rd, Clondalkin Dublin 22Mar 2025€673,71853 m
3 Mill Pond, Mill Lane, Clondalkin Dublin 22Feb 2025€265,00099 m
25 The Mill Pond, Mill Lane, Clondalkin Dublin 22Sept 2025€286,000106 m
16 Millpond, Clondalkin, Dublin 22Mar 2026€280,000120 m
28 The Mill Pond, Mill Lane, ClondalkinJun 2025€275,000131 m
20 Millpond, Mill Lane, ClondalkinJun 2025€262,500139 m
6 Leinster Terrace, Old Nangor Road, ClondalkinJan 2025€375,000145 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received20 May 2014
  2. Decision issued22 September 2014

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.