Planning Permission Ireland
GrantedIndustrialDecided 14 April 2014

Townlands of Aungierstown & Ballybane, lying to the west of the existing facility in, Newcastle, Clondalkin, Dublin 22.

Construction of a large two-storey data storage facility and substation in Clondalkin.

SD14A/0023 · South Dublin County Council · Lodged 18 February 2014

Reference
SD14A/0023
Authority
South Dublin County Council
Register status
In progress
Type
Permission
Received
18 February 2014
Floor area
33407 m²

Summary

AI-generated

The project features a 30,361 sq.m. data storage facility, a warehouse, and a HV substation with two buildings. The development on an 11.25 ha site also includes a security gatehouse, 83 parking spaces, and 25 stacks reaching 25m in height.

Industrialdata centresubstationinfrastructure
Storeys
2

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Construction of a two storey data storage facility (30,361sq. M. ), a double height warehouse building (1,670 sq. M) and a hv substation area with two buildings; 1 no. 2 storey building (968sq. M. ) and 1 no. Single storey building (190 sq. M) and associated site development works. Permission is also sought for a new site access and entrance gates, a security gatehouse, security gates, load bank garage, perimeter fencing, internal roadways, sprinkler tank, pump house, 10kv substation, water and fuel tanks, attenuation ponds, hard and soft landscaping, 83 no. New car parking spaces and bicycle shelter with ancillary site works. The highest point of any of the buildings is within 20m of the original ground level with the 25 no. Stacks at 25m. Provision for a temporary construction entrance and haul road off the baldonnel road to the south of the site has been allowed for; an eis (environmental impact statement) will be submitted with this application, all on a 11.25 ha site.

Land-use zoning

What this land is zoned for

EESI
To provide for enterprise and employment related uses

National zoning type: Industrial, enterprise, employment

Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 24 November 2014. A completion certificate was lodged on 11 June 2021.

Notified floor area: 11,000

11 commencement notices are linked to this development.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received18 February 2014
  2. Decision due14 April 2014
  3. Decision issued14 April 2014
  4. Grant issued15 May 2014

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.