Planning Permission Ireland
GrantedIndustrialDecided 27 March 2017

Grange Castle Business Park, Nangor Road, Clondalkin, Dublin 22.

Construction of a new pharmaceutical production facility at Grange Castle Business Park.

SD17A/0019 · South Dublin County Council · Lodged 31 January 2017

Reference
SD17A/0019
Authority
South Dublin County Council
Register status
In progress
Type
Permission
Received
31 January 2017
Floor area
2610 m²

Summary

AI-generated

The development consists of a new pharmaceutical production facility with a floor area of approximately 2,998 sqm, an electrical building, a pump house, and an external utility yard. The application is accompanied by an Environmental Impact Statement and requires an Industrial Emissions Licence.

Industrialpharmagrange castleeisindustrial
Storeys
2

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Construction of a new predominantly single storey pharma production facility at a height of 15.95m with partial 2 storey plant room & enclosed roof top plant platform, single storey electrical building 126sq. M, an external utility yard for tanks and equipment and a single storey pump house 16sq. M. The main facility has a total floor area of 2998sq. M approx. The proposed development will also include signage, bicycle shelter, smoking shelter, waste storage area, underground fire water storage tank, 37 car park spaces (of these 3 spaces are accessible & 4 e-car spaces); new hard and soft landscaping and modifications to existing berm, circulation roads and footpaths are also to be included, temporary construction access to east of the site, new site fence to match existing and retain existing temporary access point into new fence line for the purposes of emergency access only and all associated site works. An eis (environmental impact statement) will be submitted with this application, all on an 8.4 hectare site. This application relates to development which comprises of an activity which requires an industrial emissions licence in accordance with the first schedule of the epa act 1992 as amended.

Land-use zoning

What this land is zoned for

EESI
To provide for enterprise and employment related uses

National zoning type: Industrial, enterprise, employment

Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 30 June 2017. A completion certificate was lodged on 19 September 2022.

Notified floor area: 2,365

8 commencement notices are linked to this development.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received31 January 2017
  2. Decision due27 March 2017
  3. Decision issued27 March 2017
  4. Grant issued8 May 2017

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.