Takeda Ireland Limited facility, Grange Castle Business Park, Nangor Road, Grange, Dublin 22
Installation of solar carports and a ground-mounted solar array at the Takeda facility in Grange Castle.
SD25A/0097W · South Dublin County Council · Lodged 14 July 2025
- Reference
- SD25A/0097W
- Authority
- South Dublin County Council
- Register status
- Decided
- Type
- Permission
- Received
- 14 July 2025
Summary
AI-generatedThe development consists of installing solar carports over existing surface car parks and a ground-mounted solar PV array. It includes a single-storey transformer unit, micro-inverters, cabling, and integrated lighting.
- Storey
- 1
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
The installation of solar carports and a ground mounted solar pv array. The proposed development will consist of solar carports (three and five panel versions) over existing surface car park areas, solar panels on ground mounted frames, 1 no. Single-storey low voltage / medium voltage transformer (skid) unit, micro inverters, underground electrical ducting and cabling within the development site, integrated lighting for carport areas, and all associated ancillary development works, including ground works and landscaping. Construction and operational access will be via existing site entrances from the existing grange castle business park internal road network.
Land-use zoning
What this land is zoned for
“To provide for enterprise and employment related uses”
National zoning type: Industrial, enterprise, employment
Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.
Read the zoning objectives in the development planKey dates
Timeline
- Application received14 July 2025
- Decision due11 August 2025
- Decision issued11 August 2025
- Permission expiry22 September 2030
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- GrantedAt this site
Amendments to the previously approved application SD17A/0354: Increase of total main building floor area over…
Grange Castle Business Park, Nangor Road, Clondalkin, Dublin 22.
SD18A/0092South DublinLodged 22 Mar 2018Industrial
- GrantedAt this site
Construction of a new facility to include the construction of a two storey biopharma production facility to a…
Grange Castle Business Park, Nangor Road, Clondalkin, Dublin 22.
SD17A/0354South DublinLodged 29 Sept 2017Industrial
- GrantedAt this site
Amendments to the previously approved application SD17A/0019 consisting of: removal of escape stair to the…
Grange Castle Business Park, Nangor Road, Clondalkin, Dublin 22.
SD17A/0388South DublinLodged 26 Oct 2017Commercial
- GrantedAt this site
Construction of a new predominantly single storey Pharma production facility at a height of 15.95m with…
Grange Castle Business Park, Nangor Road, Clondalkin, Dublin 22.
SD17A/0019South DublinLodged 31 Jan 2017Industrial
- Granted40 m away
Construction of P3 Phase II expansion of the existing P3 biopharma production facility which includes the…
Grange Castle Business Park, Nangor Road, Clondalkin, Dublin 22
SD20A/0147South DublinLodged 20 Aug 2020Industrial
- Granted70 m away
New single storey electrical building at a height of 4.15m with an area of 136sq.m., an external utility yard…
Grange Castle Business Park, Nangor Road, Clondalkin, Dublin 22.
SD18A/0169South DublinLodged 16 May 2018Industrial
- Granted140 m away
Construction of a 257sq.m. extension 26m x 9.875m x 13.1m high to the southern end of the existing warehouse,…
Takeda Ireland Ltd, Grange Castle Business Park, Clondalkin, Dublin 22.
SD13A/0107South DublinLodged 31 May 2013Industrial
- Granted140 m away
The erection of 2 illuminated, 1.75m high x 4.7m wide Takeda company logo signs at heights of 36.945 metres…
Grange Castle Business Park, Clondalkin, Dublin 22
SD17A/0118South DublinLodged 12 Apr 2017Commercial
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- Awaiting decisionEnergy
For the installation of double row V-shaped duo-pitch and single row mono-pitch solar carports over the…
Site to the northwest of the Phoenix Sports and Restaurant Building and to the north of the bus park on the North Campus of , Maynooth University , Maynooth
2560093KildareLodged 5 Feb 2025
- Awaiting decisionEnergy
Proposed solar PV energy development comprising the installation of solar photovoltaic (PV) panels on ground…
IDA Industrial Park , Old Kilmeadan Road , Knockhouse Lower Waterford.
2560381WaterfordLodged 29 May 2025
- GrantedEnergy
The installation of double row V-shaped duo-pitch and single row mono-pitch solar carports on the existing…
Pfizer Ireland Pharmaceuticals, Grange Castle Business Park, New Nangor Road, Clondalkin, Dublin 22.
SD24A/0127WSouth DublinLodged 29 Jul 2024
- GrantedEnergy
For planning permission. The development will consist of a Ground Mounted Solar PV Array, in the existing car…
NSC Campus , Saint Michaels Drive , Mahon
2341906Cork CityLodged 11 Apr 2023
- GrantedEnergy
For the development of a solar photovoltaic panel array consisting of up to 43, 500 m2 of solar panels on…
Knockanulty , Ennistymon , Co. Clare
16654ClareLodged 22 Aug 2016
- GrantedEnergy
The development will consist of the installation of roof mounted solar PV arrays on the existing…
The Novum Building, Clonshaugh Business & Technology Park, Dublin 17
WEB5290/25Dublin CityLodged 2 Oct 2025
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.