Planning Permission Ireland
GrantedIndustrialDecided 16 May 2018

Grange Castle Business Park, Nangor Road, Clondalkin, Dublin 22.

Amendments to a previously approved industrial development at Grange Castle Business Park, including a floor area increase of 163 sq.m.

SD18A/0092 · South Dublin County Council · Lodged 22 March 2018

Reference
SD18A/0092
Authority
South Dublin County Council
Register status
In progress
Type
Permission
Received
22 March 2018
Floor area
5100 m²

Summary

AI-generated

The proposed development consists of amendments to the previously approved application SD17A/0354. Changes include a 163 sq.m floor area increase, minor elevation amendments, relocation of the electrical building and nitrogen tank, a new CO2 tank compound, and a reduction in car parking spaces from 81 to 47. An Environmental Impact Assessment Report (EIAR) is submitted as the activity requires an Industrial Emissions Licence.

Industrialindustrialamendmentseiar

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Amendments to the previously approved application sd17a/0354: increase of total main building floor area over both floors of 163sq. M, minor amendments to building elevation including changes to external doors and windows to both electrical building and main building, the relocation of the approved electrical building and reduction in area, the relocation of the approved nitrogen tank and the inclusion of a co2 tank compound of approximately 28sq. M, removal of approved pump house from site plan, removal of piperack connection to existing piperack, relocation of bicycle shelter, relocation and reduction of car parking spaces from 81 to 47 (of these 2 are accessible and 4 are e-car spaces). An eiar (environmental impact assessment report) will be submitted with this application, all on an 8.2 hectare site at grange castle business park. This application relates to development which comprises of an activity which requires an industrial emissions licence in accordance with the first schedule of the epa act 1992 as amended.

Land-use zoning

What this land is zoned for

EESI
To provide for enterprise and employment related uses

National zoning type: Industrial, enterprise, employment

Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 30 June 2017. A completion certificate was lodged on 19 September 2022.

Notified floor area: 2,365

8 commencement notices are linked to this development.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received22 March 2018
  2. Decision due16 May 2018
  3. Decision issued16 May 2018
  4. Grant issued25 June 2018

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.