Belgard Castle Demesne, Belgard Road, Clondalkin, Dublin 22.
Construction of a Learning Archive, an Entrance Pavilion, and an Education Centre at Belgard Castle.
SD17A/0406 · South Dublin County Council · Lodged 15 November 2017
- Reference
- SD17A/0406
- Authority
- South Dublin County Council
- Register status
- Decided
- Type
- Permission
- Received
- 15 November 2017
- Floor area
- 6050 m²
Summary
AI-generatedThe project includes an 805sq.m underground Learning Archive, a new single-storey Entrance Pavilion following partial demolition of a finance building, and a 4,314sq.m Centre of Education, Learning, Innovation and Collaboration for CRH.
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
(1) the construction of a learning archive, located under the upper courtyard between the coach house and the castle’s annex building, comprising site excavation and construction of a basement archive space, reading rooms, exhibition spaces and ancillary, toilet and storage facilities providing a link to the lower castle courtyard through one of three existing fuel vaults. The floor area of the proposed building is 805sq. M. (2) the removal of the front two storey section of the existing finance building which has a floor area of 191sq. M. And the construction of a single story entrance pavilion providing access via stair and lift to the learning archive below and to the remainder of the finance building. The floor area of the entrance pavilion is 130sq. M. (3) the re-instatement of the stable yard above the learning archive as a re-ordered landscaped space including a light well to the learning archive below. (4) the construction of a centre of education, learning, innovation and collaboration for crh on the site of the existing main car park and grounds maintenance facilities. The building, which has a floor area of 4,314sq. M. , contains flexible education spaces of various sizes, breakout and collaboration spaces as well as dining facilities, kitchens, store rooms, welfare, plant and ancillary support spaces and is constructed over basement, ground, part-mezzanine and rooftop pavilion levels. The building is excavated into the steeply sloping landscape such that the main green ‘living’ landscaped roof aligns with the adjacent existing site levels to the south of the site. The landscaped roof is proposed to include bio diverse planting, reflection pool, paving and safety-related railings. The centre of education, learning, innovation and collaboration will be connected below ground level to the learning archive via an underground link which has a floor area of 230sq. M. (5) an extensive landscape enhancement programme including hard and soft landscaping in a manner compatible with the historic nature of the demesne is proposed, ensuring the assimilation of all contemporary building interventions into the existing character of the estate. (6) the provision of a new internal access road and service delivery area adjacent to the western perimeter serving the centre for education, learning innovation and collaboration, as well as the proposed grounds maintenance facility and accessing reconfigured existing car parking with provision of cycle parking and coach set down bay to the south. (7) the removal of the existing temporary security hut, floor area 30sq. M. And the provision of a permanent security gate lodge, floor area 36sq. M. In a similar location at the main entrance from belgard road. (8) the demolition and removal of the existing machinery sheds and demesne maintenance buildings, floor area 200sq. M. From their location beside the existing main car park. The construction of replacement machinery and maintenance buildings which also accommodate ancillary staff facilities, a new esb substation and switch-rooms, boiler plant, generator and ancillary storage facilities. The combined floor area of new buildings is 489sq. M. The facility also includes a new service yard, area 750sq. M. All at the western corner of the site. (9) the removal of the existing storage shed and esb substation and oil tank enclosure combined floor area 146sq. M located proximate to the coach house and replacement with a new ancillary services, boiler plant and storage building serving the learning archive and existing coach house, floor area 46sq. M. In the same general area. (10) the provision of a solar pv array, ground-mounted on support structures comprising an area of 400sq. M. With an overall footprint of 963sq. M. Including surrounding fence and ancillary equipment cabinet to serve the renewable energy needs of the proposed development within an area currently in tillage. (11) ancillary site development works including hard and soft landscaping, utility and drainage services, set down areas, external lighting, miscellaneous plant and equipment. All located at crh belgard demesne, belgard castle a protected structure and recorded monument reference smr du021-026.
Land-use zoning
What this land is zoned for
“To protect and improve rural amenity and to provide for the development of agriculture”
Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.
Read the zoning objectives in the development planKey dates
Timeline
- Application received15 November 2017
- Decision due18 January 2018
- Decision issued18 January 2018
- Grant issued20 February 2018
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- GrantedAt this site
Construction of a new single storey 16sq.m. coffee dock area to be located between the buildings known as…
Belgard Castle, Belgard Road, Clondalkin, Dublin 22.
SD14A/0018South DublinLodged 13 Feb 2014Commercial
- GrantedAt this site
Permission for : the refurbishment of the Castle Annex Office Building including a link with new offices to…
Belgard Castle, Belgard Road, Tallaght, Dublin 24
SD13A/0065South DublinLodged 15 Jul 2013Commercial
- GrantedAt this site
Removal of the existing stone mounted signage at existing entrance and the erection of a new Belgard Quarry…
Belgard Castle, Belgard Road, Clondalkin, Dublin 22.
SD14A/0234South DublinLodged 6 Nov 2014Alterations
- Granted100 m away
The installation of post and wire security fencing, including the provision of lighting, perimeter gravel…
Belgard Castle, Clondalkin, Dublin 22
SD17A/0011South DublinLodged 8 May 2017Infrastructure
- Exempt — no permission needed140 m away
The erection of a replacement glasshouse superstructure onto an existing masonry base. Formation of pad…
Belgard Castle Demesne, Belgard Road, Clondalkin, Dublin 22.
ED23/0007South DublinLodged 28 Feb 2023Other
- Exempt — no permission needed170 m away
Replacement of a short flight of stone steps, introduced into the site from some other locations with 5…
Belgard Castle, Belgard Road, Clondalkin, Dublin 22.
ED17/0011South DublinLodged 24 Feb 2017Alterations
- Granted200 m away
Renovation and refurbishment of existing stable building (currently used for storage). Annex buildings…
Belgard Castle, Belgard Road, Dublin 24.
S01A/0661South DublinLodged 15 Jan 2002Change of use
- Exempt — no permission needed220 m away
The works that are the subject of this Section 5 Application are primarily repair works to the rendered…
CRH Plc, Belgard Castle, Belgard Road, Dublin 22
ED15/0013South DublinLodged 14 Apr 2015Alterations
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedAlterations
We the Commissioners of Public Works in Ireland intend to apply for 10 year permission for development. The…
Annes Grove House & Gardens, Castletownroche, Co. Cork,
236104corkLodged 17 Oct 2023
- Awaiting decisionChange of use
The development will consist of the refurbishment and change of use of the former stable buildings and former…
Castle Stables and Courtyard at Rathfarnham, Grange Road/Rathfarnham Road, Dublin14 D14 FC62 & D14 XT02
PT8SD240South DublinLodged 8 May 2025
- GrantedEnergy
The development will consist of amendments to the Strategic Housing Development permitted under An Bord…
Citywest Shopping Centre, Fortunestown, Dublin 24
SD22A/0299South DublinLodged 11 Oct 2022
- GrantedInfrastructure
The proposed development includes the removal of interim accommodation permitted under Ref. No. LB190739 and…
Mill Road Colp West , Drogheda , County Meath
2460133MeathLodged 23 Feb 2024
- GrantedEnergy
The application site comprises an area of c. 5.61hectares. The site is primarily located in the townland of…
Corracunna, Coolnanave Garrane Mitchelstown Co. Cork
24/6272corkLodged 2 Dec 2024
- GrantedEnergy
Alterations to the development permitted under Reg. Ref.: SD18A/0068, as previously amended under Reg. Ref.:…
3-4, Crag Avenue, Clondalkin Industrial Estate, Clondalkin, Dublin 22
SD23A/0158South DublinLodged 12 Jul 2023
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.