GrantedCommercialDecided 10 November 2021

Grange Castle Business Park, Nangor Road, Clondalkin, Dublin 22

Modifications to a previously approved office and data centre development in Grange Castle.

SD21A/0203 · South Dublin County Council · Lodged 13 October 2021

Reference
SD21A/0203
Authority
South Dublin County Council
Register status
Decided
Type
Permission
Received
13 October 2021
Floor area
57986 m²

Summary

AI-generated

Proposed changes to an approved scheme include relocating and expanding the Central Administration Building, adding a basement level under the cafeteria, raising the office building height, and reconfiguring roof plant areas.

Commercialdata centreofficebusiness park
Storeys
4

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Modifications and minor additions to previously approved scheme (planning register reference sd20a/0283) at this site of c. 16.23ha (in total) comprising of the following changes to previously approved scheme sd20a/0283; approved central administration building (cab), relocation of building to the east by approx. 7m; reconfiguration and setting out of building plans at all levels (including roof level) resulting in increase in building footprint of approximately 170sq. M (from 1,424sq. M to 1,594sq. M) associated changes to building elevations (design and finishes); approved single storey cafeteria element, additional basement level below cafeteria to accommodate plant; 9 rooflights (2.8 m diameter) and 9 rooflight (1.8m diameter), inclusion of mep plant on roof level including new flue extending approx. 1m above parapet; approved four-storey office element, parapet at roof level to be raised by approx. 1.1m (increased from approved 19.5m in height to proposed 20.6m); overall increase in gifa of 395sq. M; reconfiguration of area available for pv panels and sedum roof finish in order to accommodate required mep equipment at roof levels. Approved data centres - dub14 and dub15, reconfiguration and setting out affecting building locations and plans at all levels (including roof level) resulting in reduction in overall building footprint (for each building) by 48sq. M (from 13,442sq. M to 13,394sq. M), associated changes to staircases design, building elevations design and finishes, increase in parapet height of vent houses (at roof level) by approx. 350mm and omission of previously proposed zone of sedum roof finish; overall decrease in gifa of 1,352sq. M in respect of dub 14 and decrease of 1,453sq. M in respect of dub 15; all plant equipment at ground level - reduced in height compared to approved layout so that the screening is deemed not required; dub 14, reduction in height of approved flues by approx. 650mm, reduction in number of flues from 11 approved to 8 proposed; dub 15, change to level of ground floor and associated increase in overall building height of approx. 700mm (parapet height increased from approved +83.0m o. D. To proposed +83.7m o. D. ); reconfiguration of associated external plant at ground level (including generators / e-houses & transformers) flues, omission of approved modular electrical rooms (mers) and associated screening serving approved data centres dub14 &15; relocation, modifications to design and expansion of approved water treatment building and associated plant to include, water treatment tanks, 2 sprinkler tanks and relocated approved pump house (contained in the main water treatment plant building) and 1 generator with additional proposed flue stack (height 30.75m) and 1 transformer; gas generator compound - relocation & reconfiguration of previously approved gas generator compound including, additional 4 generators (from 20 approved to 24 proposed), omission of approved e-houses; additional 7 electrical rooms, additional 7 flues (from 5 approved to 12 proposed); modifications to approved layout of internal site roads, yards and footpaths; relocation and modifications to design of approved sprinkler tanks and pump houses, pump house serving dub 14, relocated into proposed water treatment building and compound, redesign of approved larger tank into proposed two smaller tanks; pump house serving dub 15, relocated to south of dub15 the north facilitate space for electrical equipment redesign of approved larger tank into proposed two smaller tanks; relocation of approved gas networks ireland (gni) gas skid & compound including approved 3 kiosk buildings; modifications to approved car park layouts and landscaping design; modifications to location and design of approved bicycle shelters; modifications to site development works, including underground water and building services provision, landscaping, internal security and compound enclosure fencing, and associated works; the remainder of the development (including permitted temporary construction car parking) to be carried out in accordance with parent permission sd20a/0283. An environmental impact assessment report (eiar) has been submitted with this application; the application relates to a development which comprises an activity requiring an integrated pollution prevention and control (ie) licence relating to lands located west of the existing ms data centre campus and also a site located north of the main entrance to the business park from grange castle road.

Land-use zoning

What this land is zoned for

EESI
To provide for enterprise and employment related uses

National zoning type: Industrial, enterprise, employment

Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 15 February 2022. A completion certificate was lodged on 17 January 2025.

Notified floor area: 3,940

12 commencement notices are linked to this development.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received13 October 2021
  2. Further information requested13 September 2021
  3. Further information received13 October 2021
  4. Decision due10 November 2021
  5. Decision issued10 November 2021
  6. Grant issued20 December 2021

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.