Planning Permission Ireland
GrantedChange of useDecided 19 July 2024

Part of the ground & first floor levels, (previously Unit No's 27M, 28M & 29M), City West Shopping Centre, Citywest, Dublin 24

Conversion of a children's play facility at Citywest Shopping Centre into a new three-storey public library.

SD24A/0135 · South Dublin County Council · Lodged 27 May 2024

Reference
SD24A/0135
Authority
South Dublin County Council
Register status
Decided
Type
Permission
Received
27 May 2024

Summary

AI-generated

The development consists of a change of use of the former children's play facility to a public library. It includes internal alterations to the ground and first floors, and the construction of a new second-floor extension with a sedum roof, providing a library arranged over three floors.

Change of uselibraryconversionextension
Storeys
3
Floor area
1,633 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The development will consist of a change of use of a children's play facility (established under sdcc ref. Sd17a/0301) at part ground and part first floor level of the existing citywest shopping centre building together with associated internal works of conversion and refurbishment and the erection of a new second floor extension with sedum roof on top to provide a public library that is arrange over three floors, as follows: (i) ground floor - internal alteration and conversion of the existing ground floor lobby (approx 92 sq. M gia). The existing light and stair access will provide access to the two upper floors that will contain the main floorspace associated with the library; (ii) first floor - internal alteration and conversion of existing floorspace (approximately 906 sq. M gia) to provide public library space with ancillary staff and welfare facilities together with circulation areas. Provision is also made for additional / new external ancillary plant to the rear terrace (approximately 71 sq. M) and pv panels; and (iii) second floor - construction of a new second floor extension to provide approx. 635 sq. M of public library floorspace (gia) together with a west facing outdoor roof terrace (of approximately 117 sq. M). Associated external works include the provision of 16 no. Short stay bicycle parking spaces (8 no. Sheffield stands) and 2 no. Secure long stay bicycle spaces.

Land-use zoning

What this land is zoned for

DCDC
To protect, improve and provide for the future development of District Centres

National zoning type: District, neighbourhood centre

Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 7 May 2025.

Notified floor area: 902

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
309 Citywest Plaza, Citywest, Dublin 24Jan 2026€250,00056 m
307 Citywest Plaza, Citywest, Dublin 24Sept 2025€235,00056 m
6 Fortunes Lawn, Citypark, CitywestJul 2025€300,00068 m
58 Fortunes Lawn, Citywest, Dublin 24Nov 2025€295,00069 m
71 Fortunes Lawn, City Park, CitywestAug 2025€325,00069 m
23 Fortones Lawn, Citypark, CitywestFeb 2026€300,00069 m
9 Fortunes Walk, City Park, City WestJul 2025€295,00095 m
11 Fortunes Walk, City Park, Citywestnot full market priceJul 2025€270,00095 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received27 May 2024
  2. Decision due22 July 2024
  3. Decision issued19 July 2024
  4. Permission expiry29 August 2029

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.