Planning Permission Ireland
GrantedApartmentsDecided 31 October 2023

Within the townland of Cappagh, Clonburris, Dublin 22

Construction of a mixed-use development with 594 apartments, offices, retail, and a creche in Clonburris.

SDZ22A/0018 · South Dublin County Council · Lodged 6 October 2023

Reference
SDZ22A/0018
Authority
South Dublin County Council
Register status
Decided
Type
SDZ Application
Received
6 October 2023

Summary

AI-generated

This large-scale SDZ development comprises 594 apartments across multiple blocks ranging from 4 to 7 storeys. The scheme also includes office floorspace, 4 retail units, a creche, and an urban square.

Apartmentsapartmentsmixed usesdzcreche
Residential units
594

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Construction of a mixed-use development comprising 594 apartments, office floorspace, 4 retail units, a creche and urban square in the clonburris development areas cucs3 & csws3 of the clonburris sdz planning scheme 2019 as follows, 594 apartments (255 one bedroom apartments, 307 two bedroom apartments and 32 three bedroom apartments (all apartments to have terrace or balcony; ancillary communal amenity spaces for residents) as follows; block a (4 and 6 storeys with undercroft) comprises 96 apartments consisting of 36 one bedroom apartments, 48 two bedroom apartments and 12 three bedroom apartments (with creche c. 609sq. M at ground and first floor as well as play area; block b (6 storeys with undercroft) comprises 77 apartments consisting of 44 one bedroom apartments, 28 two room apartments and 5 three bedroom apartments; block d (5 and 7 storeys with undercroft) comprises 71 apartments consisting of 39 one bedroom apartments and 32 two bedroom apartments; block e (6 storeys with undercroft) comprises 100 apartments consisting of 47 one bedroom apartments, 48 two bedroom apartments and 5 three bedroom apartments; block f (5 and 7 storeys with undercroft) comprises 124 apartments consisting of 57 one bedroom apartments, 61 two bedroom apartments and 6 three bedroom apartments; block g (1, 2 and 4 storeys with undercroft) comprises 65 apartments consisting of 16 one bedroom apartments, 45 two bedroom apartments and 4 three bedroom apartments; block h (4 storeys with undercroft) comprises 61 apartments consisting of 16 one bedroom apartments and 45 two bedroom apartments; mixed use development comprising, commercial office development in block c of 6 storeys with parapet above to 7 storey equivalent on elevations (c. 4,516sq. M), 1 retail unit at ground floor of block b (c. 147.5sq. M) and 3 retail units at ground floor of block e as follows (c. 106.2sq. M, c. 141.6sq. M and c. 492.2sq. M respectively) as well as a creche (c. 609sq. M) at ground floor and first floor of block a; vehicular access will be from the permitted clonburris southern link street (sdz20a/0021) and r 113 to the east; public open space/landscaping of c. 0.52 hectares (urban square) and linear open space (0.72 hectares) as well as a series of communal open spaces to serve apartments over undercroft level (and internal communal open space c. 685 sq. M; the development will also provide for all associated works and infrastructure to facilitate the development to include all ancillary site development works including footpaths, landscaping boundary treatments, public, private open space areas, car parking (396 no. Spaces in a mixture of undercroft spaces block a, block b&d and block e&f) and bicycle parking (1,232 spaces at undercroft and surface levels), single storey esb substations/bike/bin stores, green roofs, solar panels at roof level of apartments, plant areas within blocks and all ancillary site development/construction works; permission is also sought for connection to water supply, and provision of foul drainage infrastructure. This application is being made in accordance with the clonburris strategic development zone planning scheme 2019 and relates to a proposed development within the clonburris strategic development planning scheme area ' as defined by statutory instrument no. 604 of 2015; an environmental impact assessment report accompanies this planning application.

Land-use zoning

What this land is zoned for

SDZRS
To provide for strategic development in accordance with approved planning schemes

National zoning type: Residential, mixed residential and other uses

Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 19 December 2023.

Notified floor area: 14,788

5 commencement notices are linked to this development.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
2 Parkleigh Green, Parkleigh, Seven MillsFeb 2026€385,000123 m
15 Parkleigh View, Seven Mills, Clonburrisprice excludes VATJan 2025€397,900208 m
10 Lockhouse Drive, Seven Mills, Clonburrisprice excludes VATSept 2025€436,123217 m
12 Lockhouse Place, Seven Mills, Clonburrisprice excludes VATSept 2025€427,312217 m
8 Lockhouse Place, Seven Mills, Clonburrisprice excludes VATSept 2025€436,123217 m
14 Lockhouse Place, Seven Mills, Clonburrisprice excludes VATSept 2025€436,123217 m
42 Lockhouse Lawn, Seven Mills, Clonburrisprice excludes VATApr 2026€422,907217 m
10 Parkleigh Row, Seven Mills, ClonburrisJul 2026€488,000242 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received6 October 2023
  2. Decision due2 November 2023
  3. Decision issued31 October 2023

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.