Planning Permission Ireland
GrantedChange of useDecided 31 May 2018

The Bank Building, Meagher Street, Dungarvan

Conversion of a former bank and protected structure to a restaurant and bar in Dungarvan.

1847 · Waterford City and County Council · Lodged 26 January 2018

Reference
1847
Authority
Waterford City and County Council
Register status
Decided
Type
PERMISSION
Received
26 January 2018

Summary

AI-generated

This application proposes changing the use of a former bank building (a Protected Structure) from offices to a restaurant and public bar. The works include partial demolitions, constructing a single-storey rear extension, basement extensions, installing a lift, and carrying out extensive repairs to the historic fabric.

Change of useprotected structurerestaurantpubdemolition

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Change of use of a former bank building, (a protected structure), from offices (most recently used as an arts centre) to restaurant & public bar use with ancillary kitchen, services, stores and toilet facilities. Demolition of glazed roof to rear return (11m2), lean-to abutting south gable (18m2) and return structure (40m2) to rear &abutting 3 storey staircase link to laboratory building to the north gable (5m2 at each level) and block up doors to north gable. Construct a single storey extension (148m2) to the rear of the ground floor level extension&extend rear basement area (43.5m2), re-construct lean-to(18m2) abutting south gable with glazed openings to front & rear. Reduce cill level to rear elevation window at ground floor to enable access to extension kitchen area. Construction of a 1st floor ext to accommodate lift, dumb waiter & services(17m2 to 1st floor) to the rear to facilitate making the building accessible. Reduce cill level to 2 rear elevation windows to enable access to lift&dumbwaiter. Existing basement floor level generally;repair of tanking,new partitions,renewal to non-original linings&finishes. Existing ground floor level generally;repair of lime plaster&decorative plaster,repair of existing tiled&timber floor finishes, new floor finishes&alterations to non-original finishes. New structural opes&partitions&fittings. Existing 1st floor level generally,removal of non-original internal partitions & toilet fittings & replacement with new internal partitions, toilet fittings, new kitchen&restaurant fittings&services for 1st floor kitchen. Replace existing aluminium windows to ground&1st floor with of timber sliding sash windows with "slimlite" double glazing. Fire rate existing ground floor ceiling with rockwool on metal mesh between joists&fire rate existing original doors using envirograph products. Repair of original joinery, shutters&casings, original extant skirtings, re-use of remaining original intact floorboards. Repair & localized re-pointing of façade with traditional lime mortar, biocide&remove façade¶pet vegetation, repair cracks to façade&chimneys&doff cleaning of façade. Replacement of mechanical&electrical services to building, including provision of passenger lift&service dumbwaiter & re-location of main electrical board from entrance hall. Redecoration internally&externally on completion, provide 2 no. Accessible parking spaces&1 no delivery space to rear. Hard&soft landscaping incl awnings to the external terrace areas

Land-use zoning

What this land is zoned for

TCUC
Provide for the development and enhancement of town core uses including retail, residential, commercial, civic and other uses.

National zoning type: City/Town/village Centre, central area

Objective set by the WCCC Development Plan 2022 - 2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Apt 8, The Bridge, Bridge StJun 2025€192,50070 m
32 The Bridge, T F Meagher St, DungarvanNov 2025€230,00070 m
Apt 1, High St, DungarvanFeb 2025€935,000133 m
14 O Connell Street, Dungarvan, WaterfordMar 2026€200,000210 m
Apt 28 Cois Mara, Davitt's Quay, DungarvanAug 2025€287,000234 m
Doolin, Apt 6 Cois Mara, Davitts QuayJun 2025€185,000234 m
Apt.33 - Cois Mara, Davitts Quay, DungarvanSept 2025€245,000234 m
Apt.33 - Cois Mara, Davitts Quay, DungarvanMar 2025€140,000234 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received26 January 2018
  2. Further information requested22 March 2018
  3. Further information received25 April 2018
  4. Decision due5 June 2018
  5. Decision issued31 May 2018
  6. Appeal submitted26 June 2018
  7. Appeal decided31 January 2019
  8. Permission expiry30 January 2024

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.