Planning Permission Ireland
GrantedChange of useDecided 23 July 2024

Site of Walsh's Hotel, Barrack Street/Green Street, Cappoquin

Change of use from Walsh's Hotel to a hostel with internal alterations, repairs, and new parking spaces.

24120 · Waterford City and County Council · Lodged 4 June 2024

Reference
24120
Authority
Waterford City and County Council
Register status
Decided
Type
PERMISSION
Received
4 June 2024

Summary

AI-generated

The project involves converting the existing hotel building into a hostel. Works include reducing the bedroom count to 6 en-suite rooms on the first floor, converting ground floor spaces into 2 en-suite bedrooms and a reception, installing solar panels, and removing fuel pumps on Barrack Street to provide parking.

Change of usehosteltourismsolarrenovation

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

For a. Change of use from hotel to hostel incorporating the following; changes to hotel building; ground floor: change kitchen and dining room to 2 no. En-suite bedrooms, change lobby to provide new reception, d/a wc in storeroom, removal of bar and internal counters in lounge and provide double doors from lounge to new raised patio with ramped and stepped access. First floor. Change 10 bedrooms and bathroom to 6 en-suite bedrooms plus storage, remove hot press, create protected stairwell, repair timber sash windows and insert new slimline double glazed units. Removal of wood-effect beauty board and make good walls. Change 2 no external doors and all necessary repairs, upgrades of services, electrical, plumbing, heating and ventilation including fire protection measures to building. Extend toilet facilities in existing stone building plus new solar panels on roof: reroof & repair existing concrete shed. On barrack street remove fuel pumps, provide 3 no. Car parking spaces and new pedestrian access with gate. On site provide 3 no car parking spaces, incl. D/a parking space, ev charge point, bicycle parking, bin area, hard and soft landscaping, lighting, circulation route, change the 2 no access gates to site to timber gates & upgrade of all services on site. B. Install 3 glamping pods on east of site and remove a portion of cast concrete wall c. Signage on east and west elevations of hotel building, for reception and accommodation name and on forecourt a sign to indicate direction to reception and a sign for car parking. This is a protected structure rps wa 750504 niah 22810041

Land-use zoning

What this land is zoned for

RVRV
Protect and promote the character of the Rural Village and promote a vibrant community appropriate to available physical and community infrastructure.

National zoning type: Built up area

Objective set by the WCCC Development Plan 2022 - 2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
2 Hillside, Castle St, CappaquinDec 2025€200,000151 m
Barrack St, Cappoquin, WaterfordMay 2025€145,000184 m
90 Cook St, Cappoquin, WaterfordJul 2025€126,000191 m
46 Barrack St, Cappoquin, WaterfordJan 2026€90,000193 m
Barrack Street, Cappoquin, Co WaterfordApr 2025€185,000219 m
3 Church St, Cappoquin, WaterfordJan 2025€135,000264 m
10 Church Street, Cappoquin, Co WaterfordMar 2025€155,000298 m
Church St, Cappoquin, WaterfordMar 2025€200,000304 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received4 June 2024
  2. Decision due29 July 2024
  3. Decision issued23 July 2024
  4. Grant issued30 August 2024
  5. Permission expiry29 August 2029

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.