GrantedIndustrialDecided 2 October 2023

Takeda Ireland Ltd, Bray Business Park, Kilruddery Bray

Installation of a new heat pump, chillers, and a battery energy storage system at a business park.

2360205 · Wicklow County Council · Lodged 8 August 2023

Reference
2360205
Authority
Wicklow County Council
Register status
Decided
Type
PERMISSION
Received
8 August 2023

Summary

AI-generated

The project involves removing an existing chiller structure to install a new concrete plinth for a heat pump, two chillers, a dry air cooler, and an electrical panel. Additionally, a new concrete plinth will be constructed to host a Battery Energy Storage System (BESS) compound with a BESS container, switchgear container, and associated infrastructure.

Industrialbessindustrialenergy

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The removal of the existing chiller 7 structure and its associated primary pumps and concrete plinth at the northeastern portion of the site and the construction of a new concrete plinth to facilitate the installation of a heatpump, two no. Chiller’s, a dry air cooler, pressurisation unit and electrical panel. The development will also include associated pipe connections back to the takeda building; b) the provision of a new concrete plinth to the southeastern portion of the site to provide a new battery energy storage system compound which will contain a bess container and a hv switchgear container and associated transformer and inverters, cabling, ducting, landscaping and ancillary infrastructure and site development works necessary to facilitate the development

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 23 January 2024. A completion certificate was lodged on 19 December 2024.

Notified floor area: 22

3 commencement notices are linked to this development.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
30 Hollybrook Park, Bray, WicklowAug 2025€580,000166 m
47 Hollybrook Park, Bray, WicklowApr 2025€510,000182 m
66 Hollybrook Park, Bray, WicklowJul 2025€530,000188 m
51 Hollybrook Park, Southern Cross Rd, BrayNov 2025€563,000197 m
52 Hollybrook Park, Bray, WicklowNov 2025€500,000203 m
3 Hollybrook Park, Southern Cross Route, BrayFeb 2025€520,000211 m
60 Hollybrook Park, Southern Cross, BrayJul 2025€458,000237 m
61 Hollybrook Park, Bray, WicklowJun 2025€471,000240 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received8 August 2023
  2. Decision due2 October 2023
  3. Decision issued2 October 2023
  4. Grant issued8 November 2023
  5. Permission expiry7 November 2028

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.