Planning Permission Ireland
GrantedEnergyDecided 27 June 2025

Site Located northeast of the existing Kish Business Park, Arklow, Co. Wicklow

Amendments to a permitted Battery Energy Storage System (BESS) in Arklow.

2560350 · Wicklow County Council · Lodged 9 May 2025

Reference
2560350
Authority
Wicklow County Council
Register status
Decided
Type
PERMISSION
Received
9 May 2025

Summary

AI-generated

The proposed amendments to the permitted battery storage facility include replacing a three-storey structure with a 1.2-hectare open compound for self-contained batteries. It also includes a single-storey switchroom, a fire pump house, and two water storage tanks.

Energybessbattery storageenergyinfrastructure
Storey
1
Floor area
230 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Amendments to the battery energy storage system (bess) permitted on site, under wcc reg. Ref. : 23/62 (an amendment to wcc reg. Ref. : 20/1088, which was subsequently further amended under wcc reg. Ref. : 24/ 88). The proposedamendments comprise the following
  • The provision of a bess compound with a total area of c. 1.2 ha which will accommodate self-contained batteries and integral fire suppression equipment, climate control equipment and associated electrical components (in place of the previously permitted three-storey bess structure and adjacent ancillary structures)
  • A single storey bess switchroom located to the south of the bess facility with a total gross floor area (gfa) of c. 191 sq. M and total height of c. 5.3m accommodating a control room, relay room, and cable basement
  • Water services plant and storage equipment located to the north-east of the bess comprising a single-storey fire pump house with a total gfa of c. 39 sq. M and total height of c. 3.1m, and 2 no. Fire hydrant and water storage tanks with a total height of c. 10.3m
  • All associated amendments including amendments to internal access routes, landscaping and planting, boundary treatments, the provision of an acoustic barrier to the south of the bess compound, lighting, and all associated ancillary works. The operation of the development on site will require an epa industrial emissions directive (ie) licence

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Hillview, Rockbog, ArklowJan 2026€395,000438 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received9 May 2025
  2. Decision due3 July 2025
  3. Decision issued27 June 2025
  4. Grant issued5 August 2025
  5. Permission expiry4 August 2030

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.