Straboe, Ballyhacket Lower and Ballycook, Co. Carlow
Proposed solar farm and 50 MW battery storage facility in County Carlow.
2660091 · Carlow County Council · Lodged 31 March 2026
- Reference
- 2660091
- Authority
- Carlow County Council
- Register status
- Invalid or incomplete
- Type
- PERMISSION
- Received
- 31 March 2026
Summary
AI-generatedThis application is for a large-scale solar PV farm and a 50 MW Battery Energy Storage System (BESS) compound. The development spans a 126.4-hectare site and includes 13 transformer stations, a site entrance, internal access tracks, and a temporary construction compound.
- Floor area
- 64 m²
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
A proposed solar farm and battery energy storage system. The development that will consist of: (i) construction and operation solar pv panels on ground mounted steel supported structures with associated string inverters; (ii) construction of a 50 mw battery energy storage system (bess) compound consisting of bess units, integrated cabinets, spare parts containers, independent power producer (ipp) building (c. 64sqm) and security fencing (c. 2.6m in height); (iii) installation of 13 no. Transformer stations at various points across the site; (iv) internal underground trenching, electrical cabling and ducting between the solar pv arrays and electrical inverters/transformers; (v) provision of 1 no. New site entrance from the l6003 and provision of 2 no. Passing bays along the l6003; (vi) provision of internal access tracks and watercourse/drain crossings, perimeter fencing, pole mounted cctv cameras; (vii) 1 no. Temporary construction compound; (viii) all associated site development, landscaping, drainage arrangements and ancillary works. The proposed solar farm development spans a total site area measuring c. 126.4ha, of which c. 61.3ha, the subject of this application, is located in co. Carlow and c. 65.1ha is located in co. Kildare. A separate planning application is being lodged with kildare county council. Permission is sought for a period of 10 years with an operational period of 40 years. The total capacity of solar pv panels on the entire development, including carlow and kildare, is estimated to be c. 120mw. A natura impact statement (nis) has been prepared and was submitted as part of this application. This development is covered by the provisions of the renewable energy directive iii (directive (eu) 2023/2413) and it is important to note that the planning application may be subject to section 34d of the planning and development act 2000, as amended. When a notice issues in accordance with section 34d(b), the provisions of article 26a of the planning and development regulations 2001 to 2025 shall apply
Key dates
Timeline
- Application received31 March 2026
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- Awaiting decisionEnergy
RED III Application for a solar farm development that will consist of: (i) Construction and operation solar…
Newtown , Ballycullane Lower and Ballycullane Upper , Co. Kildare
2660343KildareLodged 31 Mar 2026
- RefusedEnergy
Develop the following within Co. Laois — Linear arrays of solar PV panels on ground mounted steel supported…
Kilmullen Ullard or Controversyland Clonanny Lea and Loughmansland Glebe , Portarlington , Co. Laois
2560611LaoisLodged 23 Sept 2025
- GrantedEnergy
For a proposed solar farm development consisting of: linear arrays of solar PV panels on ground mounted steel…
Shessy North Shessy South Lydacan South , South Galway , Co. Galway
2561380galwayLodged 24 Sept 2025
- GrantedEnergy
For development which will consist of a 10-year permission for a Synchronous Condenser and Battery Energy…
Lands at , Coolshamroge , Co. Clare
2560747ClareLodged 1 Dec 2025
- Awaiting decisionEnergy
RED III APPLICATION- A solar farm and energy storage compound with a total area of circa 137 hectares. The…
in the townlands of Fyanstown , Kilmainham Rossmeen and Sedenrath , Kells
2660267MeathLodged 5 Mar 2026
- GrantedEnergy
For the construction of and a 40-year operation and subsequent decommissioning of a 48.01-hectare solar farm…
Shantallow Cloonascragh and Togher More , Tuam , County Galway
2561293galwayLodged 10 Sept 2025
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.