RefusedEnergyDecided 20 January 2022

Glendine North Fahanlunaghta More Curraghodea, Letterkelly Cloghaun More Tooreen Silverhill, Doonsallagh East and Knockalassa Co Clare

Construction of an eight-turbine wind farm and substation extension near Miltown Malbay.

211226 · Clare County Council · Lodged 18 November 2021

Reference
211226
Authority
Clare County Council
Register status
Decided
Type
PERMISSION
Received
18 November 2021
Residential units
1
Floor area
1 m²

Summary

AI-generated

A ten-year planning permission is sought for a renewable energy development featuring 8 wind turbines with a maximum tip height of 175 metres. The project includes a 30-metre meteorological mast, underground cabling, and a permanent extension to the existing 110kV substation at Knockalassa.

Energywind farmrenewable energysubstation

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • For a ten-year planning permission for the construction of a renewable energy development at this site, in the townlands of glendine north, fahanlunaghta more, curraghodea, letterkelly, cloghaun more, tooreen, silverhill, doonsallagh east and knockalassa, co. Clare (approximately 6.5km to the east of miltown malbay). The development will consist of the provision of the following: 1.8 no. Wind turbines with an overall ground-to-blade tip height in the range of 175 metres maximum to 173 metres minimum; a blade length in the range of 75 metres maximum to 66.5 metres minimum; and hub height in the range of 108.5 metre maximum to 100 metres minimum
  • A thirty-year operational life from the date of full commissioning of the development and subsequent decommissioning
  • A meteorological mast with a height of 30 metres
  • All associated underground electrical cabling (33kv) connecting the proposed turbines via ring main unit (rmu) to the 110kv substation in the townland of knockalassa
  • Permanent extension to the 110kv substation at knockalassa comprising extension to the existing substation compound, provision of a new control building with welfare facilities and all associated electrical plant and equipment for an additional 110kv bay and security fencing
  • Upgrade of access junctions
  • Upgrade of existing tracks/roads and provision of new site access roads and hardstand areas; 8.2 no. Borrow pits; 9.2 no. Temporary construction compounds
  • Site drainage
  • Forestry felling
  • Operational stage site signage; and
  • All associated site development ancillary works and apparatus. The proposed development will have an operational life of 30 years from the date of commissioning of the development and the application seeks a ten-year planning permission. An environmental impact assessment report (eiar) and a natura impact statement (nis) has been prepared in respect of the proposed development and will be submitted to the planning authority with the application

Key dates

Timeline

  1. Application received18 November 2021
  2. Decision due21 January 2022
  3. Decision issued20 January 2022
  4. Appeal submitted14 February 2022
  5. Appeal decided16 May 2024

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.