Planning Permission Ireland
RefusedEnergyDecided 11 August 2023

Ballykett Tullabrack East and Tullabrack, Kilrush, Co. Clare

Construction of a wind farm with four 150m turbines and associated infrastructure near Kilrush.

2360219 · Clare County Council · Lodged 20 June 2023

Reference
2360219
Authority
Clare County Council
Register status
Decided
Type
PERMISSION
Received
20 June 2023

Summary

AI-generated

The development in Ballykett, Tullabrack East, and Tullabrack will consist of 4 wind turbines with a tip height of 150m. It includes crane hardstands, a temporary construction compound, an 82m meteorological mast, access tracks, a bridge crossing over the Moyasta River, and a permanent electrical substation.

Energywind energyinfrastructurerenewables

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

For development, the development is located in the townlands of ballykett, tullybrack east and tullybrack, kilrush, co clare. The development will consist of the erection of 4 no. Wind turbines with an overall ground to blade tip height of 150m with a rotor diameter of 136m and a hub height of 82m. The development will also consist of the construction of crane hardstand areas and turbine foundations, new site entrance onto the l6132, construction of one no. Temporary construction compound with associated temporary site offices, parking areas and security fencing, installation of one no. Permanent meteorological mast of 82m overall height, construction of new internal site access tracks and upgrade of existing site track, to include all associated drainage including new clear span bridge crossing of the moyasta river, development of a site drainage network, biodiversity enhancement measures, construction of one no. Permanent electrical substation, ancillary forestry felling to facilitate construction of the development, all associated underground electrical and communications cabling connecting the wind turbines to the wind farm substation and to the existing tullabrack 110kv substation. This application is seeking a ten year permission and a 35 year operational life from the date of commissioning of the wind farm. The planning application is accompanied by an environmental impact assessment (eiar) and a natura impact assessment (nis)

Key dates

Timeline

  1. Application received20 June 2023
  2. Decision due14 August 2023
  3. Decision issued11 August 2023

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.