RefusedEnergyDecided 23 May 2024

Ballykett Tullabrack East Tullabrack West Tullabrack and Gower South, Kilrush, Co. Clare

Erection of four 150m-high wind turbines and associated infrastructure near Kilrush.

2460143 · Clare County Council · Lodged 29 March 2024

Reference
2460143
Authority
Clare County Council
Register status
Decided
Type
PERMISSION
Received
29 March 2024

Summary

AI-generated

A ten-year planning permission is sought for a wind farm development featuring four wind turbines with a tip height of 150m, a 38kV substation, a meteorological mast, access tracks, and a bridge crossing.

Energywind farmturbinesrenewable energyinfrastructure
Storey
1

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

For the erection of 4 no. Wind turbines with an overall ground to blade tip height of 150m with a rotor diameter of 136m and a hub height of 82m, the construction of crane hardstand areas and turbine foundations, the creation of a new site entrance onto the l6132, construction of 1 no. Temporary construction compound with associated temporary site offices, parking areas and security fencing, installation of 1 no. Permanent meteorological mast of 82m overall height, construction of new internal site access tracks and upgrade of existing site track, to include all associated drainage including new clear span bridge crossing of the moyasta river, development of a site drainage network, biodiversity enhancement measures, construction of 1 no. Permanent 38kv electrical substation, 2 no. Permanent spoil storage areas, all associated underground electrical and communications cabling connecting the wind turbines to the wind farm substation and to the existing tullabrack 110kv substation, all ancillary forestry felling to facilitate construction including the development of one no. Borrow pit, vertical realignment of an existing crest curve on the l6132. This application is seeking a ten year permission and a 35 year operational life from the date of commissioning of the wind farm. The planning application is accompanied by an environmental impact assessment (eiar) and a natura impact statement (nis)

Key dates

Timeline

  1. Application received29 March 2024
  2. Decision due23 May 2024
  3. Decision issued23 May 2024
  4. Appeal submitted19 June 2024
  5. Appeal decided8 October 2025
  6. Permission expiry7 October 2030

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.