Kilbarry 110kV Substation, Old Whitechurch Road, Kilnap Cork

Construction of a new 15-metre-high substation building and associated electrical infrastructure works.

1938211 · Cork City Council · Lodged 22 January 2019

Reference
1938211
Authority
Cork City Council
Register status
Decided
Type
PERMISSION
Received
22 January 2019

Summary

AI-generated

Permission is sought for a new 110kV Gas Insulated Switchgear building measuring 603.5 sqm and 15m in height within the existing Kilbarry Substation. The works involve demolishing a disused control building, removing three overhead line towers, and erecting four new interface masts up to 23.75m high.

Infrastructuresubstationgriddemolition
Floor area
604 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission... For the construction of a new 110kv gas insulated switchgear (gis) building, located entirely within the footprint of the existing kilbarry 110 kv substation, measuring approximately 603.5m2 and 15m in height. The works will include the demolition of the existing disused control building and oil storage facility; the removal of three existing 110kv overhead line towers and construction of four line cable interface masts (lcim) with a height of up to 23.75m; connection of existing overhead lines to new lcims and 110 kv gis substation by means of underground cables and overhead line connections; modification to the existing entrance, the internal access roads, fences and internal access gates; temporary construction facilities, compounds, hardstands; and all associated and ancillary development and site works including provision and/or replacement of electrical structures and equipment, drainage works, laying of new or replacement cables and the diversion of existing cables. A natura impact statement is submitted with this application.

Land-use zoning

What this land is zoned for

Public Infrastructure and utilitiesTU
To provide for public infrastructure and utilities.

National zoning type: Other networks and basic infrastructure/utilities uses

Objective set by the Cork City Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
2 The Crescent, Glenbride, Kilnapnot full market price · price excludes VATApr 2026€392,500366 m
10 The Crescent, Glenbride, Kilnapnot full market price · price excludes VATMay 2026€345,814366 m
11 The Crescent, Glenbride, Kilnapnot full market price · price excludes VATJun 2026€34,417366 m
7 Redforge Rd, Mallow Rd, CorkSept 2025€270,000386 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received22 January 2019
  2. Decision due10 June 2019
  3. Decision issued10 June 2019
  4. Grant issued16 July 2019

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.