Awaiting decisionEnergy

TULLYDONNELL UPPER & CONVOY TOWNPARKS, CONVOY, LIFFORD PO

A 10-year planning permission for a photovoltaic solar farm over 13.88 hectares in Convoy.

2562310 · Donegal County Council · Lodged 19 December 2025

Reference
2562310
Authority
Donegal County Council
Register status
In progress
Type
PERMISSION
Received
19 December 2025

Summary

AI-generated

The development consists of ground-mounted solar panels across two plots, an electrical control building, transformers, and perimeter fencing. It includes a 607-metre underground grid connection cable to the existing Convoy ESB substation and has a 40-year operational lifespan.

Energysolarrenewablegrid connection

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

A 10-year planning permission for construction of a photovoltaic solar farm development and all associated site works. The development will consist of linear arrays of solar photovoltaic panels on ground mounted frames over two adjacent plots of ca. 13.88 hectares overall area, including: associated cabling & ducting; a 20kv electrical control building; site entrances and access tracks; transformers and inverters; perimeter fencing up to 2.5 metres high; pole mounted cctv cameras up to 3 metres high; undergrounded electrical cable to connect the two separate solar farm plots; temporary contractor’s compound and temporary storage area; and all associated site development and ancillary works. The proposed underground grid connection cable of ca. 607 metres length will be installed along the l-5754 and l-1074 local roads from the proposed on-site electrical control building into the existing convoy esb substation. The proposed development will have a 40-year operational lifespan from the date of commissioning. The development is covered by the provisions of the (red iii) renewable energy directive iii (directive (eu) 2023/2413)

Key dates

Timeline

  1. Application received19 December 2025
  2. Further information requested26 March 2026

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.