THE TOWNLANDS OF DOVEHILL GORTAMUCK CURRAGHMORE (EGLISH BY) AND, FREAGH, CO. OFFALY
A 181.02-hectare solar farm development across three land parcels with underground cabling along a public road.
22586 · Offaly County Council · Lodged 11 November 2022
- Reference
- 22586
- Authority
- Offaly County Council
- Register status
- Invalid or incomplete
- Type
- PERMISSION
- Received
- 11 November 2022
Summary
AI-generatedThis application seeks a 10-year permission for a solar farm spanning approximately 181.02 hectares across three parcels. The development includes over 1 million square meters of solar panels, inverter stations, control buildings, and 3.8km of underground cabling within the public road corridor.
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
A 10-year permission and 40 year operation for a solar farm on 3 no. Land parcels as described herein: west parcel (dovehill townland) c. 119.25 hectares, central parcel (gortamuck & curraghmore (eglish by) townlands) c. 42.2 hectares and east parcel (gortamuck & freagh townlands) c. 16.07 hectares; a route corridor of 3.5 hectares for an underground internal electrical cable connecting the west and central parcels to the east parcel consisting of c. 3,859m underground cabling within the corridor of the l6042 'rath road' public road. The total site area for the proposed development is c. 181.02 hectares and consists of the following;1,070,756 sq. Metres of solar photovoltaic panels on ground mounted steel frames; inverter / transformer stations; underground power and communication cables and ducts; boundary security fencing; 2 no. Medium voltage (mv) control buildings; new internal access tracks associated drainage infrastructure; site entrances to the l6042 'rath road' public road; 54 no. Cctv/ lighting posts and all associated site services and works. Installations of internal network cable comprise trenching for an underground medium voltage electrical cable and associated joint bays and infrastructure, for a distance of approximately 3,859 metres in length along the l6042 'rath road' public road and approximately 661.5 metres within the solar farm lands. The proposed solar farm will be broken into 2 no. Separate phases. 'phase 1' will consist of the development of the solar pv arrays located in the east parcel (c. 16.07 ha), central parcel (c. 42.2 ha) and the west parcel (c. 52.67 ha). 'phase 2' of the solar farm will consist of the development of the remainder of the solar pv arrays in the west parcel covering a site area ofc. 66.58 ha. As part of a separate strategic infrastructure development (sid) planning application, provision of a 1 10kv electrical substation with electrical control building, associated compound with palisade fence and 2 no. Overhead line masts, which is to be located in the east parcel, will be lodged with an bord pleanála in due course
Key dates
Timeline
- Application received11 November 2022
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- Awaiting decision160 m away
A 10-YEAR PERMISSION AND 40 YEAR OPERATION FOR A SOLAR FARM ON 3 NO. LAND PARCELS AS DESCRIBED HEREIN: WEST…
THE TOWNLANDS OF DOVEHILL GORTNAMUCK , CURRAGHMORE (EGLISH BY) AND FREAGH , CO. OFFALY
22622OffalyLodged 5 Dec 2022Energy
- Granted310 m away
10-YEAR PERMISSION AND 40 YEAR OPERATION FOR A SOLAR FARM ON 3 NO. LAND PARCELS AS DESCRIBED HEREIN: WEST…
THE TOWNLANDS OF DOVEHILL GORTNAMUCK CURRAGHMORE (EGLISH BY) , AND FREAGH , CO. OFFALY
2374OffalyLodged 24 Feb 2023Energy
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- Awaiting decisionEnergy
A 10-YEAR PERMISSION AND 40 YEAR OPERATION FOR A SOLAR FARM ON 3 NO. LAND PARCELS AS DESCRIBED HEREIN: WEST…
THE TOWNLANDS OF DOVEHILL GORTNAMUCK , CURRAGHMORE (EGLISH BY) AND FREAGH , CO. OFFALY
22622OffalyLodged 5 Dec 2022
- GrantedEnergy
10-YEAR PERMISSION AND 40 YEAR OPERATION FOR A SOLAR FARM ON 3 NO. LAND PARCELS AS DESCRIBED HEREIN: WEST…
THE TOWNLANDS OF DOVEHILL GORTNAMUCK CURRAGHMORE (EGLISH BY) , AND FREAGH , CO. OFFALY
2374OffalyLodged 24 Feb 2023
- GrantedEnergy
APPLY FOR A 10 YEAR PERMISSION AND 40 YEAR OPERATION FOR A SOLAR FARM OF 146.6 HECTARES, ON 3 NO. LAND…
BALLYMACASY COOLNAGRAIGUE BALLYLINE EAST , BALLYLINE WEST , LEANAMORE AND DROMALIVAUN
23284KerryLodged 16 Mar 2023
- RefusedEnergy
A 10-year permission and 35 year operation for a solar farm on four land parcels as described herein; North…
Ballyvalode Garryduff Gortnakistin Gortyvahane Keelogs Kilmacogue Moanoola and Moanroe , Co. Limerick
211565LimerickLodged 12 Nov 2021
- RefusedEnergy
A 10 YEAR PERMISSION (TO CONSTRUCT DEVELOPMENT) FOR A SOLAR FARM COMPRISING THE INSTALLATION OF PHOTOVOLTAIC…
TOWNLANDS OF GORMAGH AND CULLEEN , TULLAMORE , CO. OFFALY
22387OffalyLodged 3 Aug 2022
- GrantedEnergy
A 10 YEAR PERMISSION (TO CONSTRUCT DEVELOPMENT). THE DEVELOPMENT WILL CONSIST OF A SOLAR FARM COMPRISING: THE…
BALLYDUFF TOWNLAND , TULLAMORE , CO. OFFALY
1711OffalyLodged 16 Jan 2017
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.