Planning Permission Ireland
GrantedInfrastructureDecided 20 July 2018

RDS Lands, Ballsbridge, Dublin 4

Construction of a temporary single-storey school building with two classrooms at the RDS.

3120/18 · Dublin City Council · Lodged 28 May 2018

Reference
3120/18
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
28 May 2018

Summary

AI-generated

The development on a protected structure site consists of a new single-storey temporary standalone building. It will provide two new classrooms and toilet facilities as additional accommodation to a previously approved temporary school.

Infrastructureschooltemporaryprotected structure
Storey
1

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Protected structure: the specific development site for this planning application comprises the sandymount building, including the yard to its rear and boundary railings (a protected structure), on simmonscourt road, ballsbridge, dublin
  • The development site is accessed from simmonscourt road. The development will consist of provision of a new single storey temporary standalone building comprising of 2 new classrooms and toilet facilities as additional accommodation to previously approved temporary school accommodation (planning reg ref: 2575/17) to be located within the existing yard to rear of site and inclusive of all associated site development works

Land-use zoning

What this land is zoned for

Z15: Community and Social InfrastructureCI
To protect and provide for community uses and social infrastructure.

National zoning type: Mixed/general community services/facilities uses

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 19 September 2018. A completion certificate was lodged on 1 October 2018.

Notified floor area: 125

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Apt 24, The Four Seasons Hotel, BallsbridgeMay 2026€1,550,00090 m
22 The Residences, Four Seasons Hotel, Dublin 4May 2026€1,250,00090 m
63 Simmonscourt Sq, Ballsbridge, Dublin 4Apr 2026€545,000164 m
70 Simmonscourt Sq, Ballsbridge, Dublin 4Apr 2026€550,000164 m
72 Simmonscourt Sq, Ballsbridge, Dublin 4Apr 2026€560,000164 m
22 Simmonscourt Sq, Ballsbridge, Dublin 4Apr 2026€790,000173 m
Glendarragh, 70 Merrion Rd, Ballsbridge Dublin 4Jan 2025€1,750,000202 m
Apt 6, Lynton Court, Ballsbridge Dublin 4May 2025€780,000204 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received28 May 2018
  2. Decision due20 July 2018
  3. Decision issued20 July 2018
  4. Grant issued28 August 2018

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.