Planning Permission Ireland
GrantedAlterationsDecided 25 April 2024

At a site within the Royal Dublin Society (RDS) Grounds, Ballsbridge, Dublin 4

Relocation of players' changing rooms and facilities to the Grandstand at the RDS.

3307/24 · Dublin City Council · Lodged 1 March 2024

Reference
3307/24
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
1 March 2024

Summary

AI-generated

The project involves the partial removal and replacement of the stand scaffold to construct a single-storey structure within the Grandstand. This will accommodate home and away players' facilities, media, medical, and official rooms.

Alterationsrdssportsheritage
Storey
1
Floor area
439 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Protected structure: the proposed development will consist of the relocation of players' changing rooms and facilities from the existing anglesea stand to the south stand, also known as the grandstand. The proposal will comprise partial removal and replacement of the stand scaffold to allow for the insertion and construction of a single-storey structure (gross floor area 439sq. M) to accommodate home and away players' facilities, media, medical and official's facilities, ancillary plant and storage accommodation, a vomitory to access the pitch; and all associated site development works including drainage and other site services. Royal dublin society complex is listed as a protected structure (record of protected structure (rps) ref. No. 5085) however the south stand (grandstand) is not specified in the reference. The rps states that the remaining structures (not listed) in the complex are excluded from the rps and are deemed not to have protected status.

Land-use zoning

What this land is zoned for

Z9: Amenity/Open Space Lands/Green NetworkOS
To preserve, provide and improve recreational amenity, open space and ecosystem services.

National zoning type: Mixed/general 'green'/recreation/conservation, other

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 21 October 2024.

Notified floor area: 437

3 commencement notices are linked to this development.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
72 Simmonscourt Sq, Ballsbridge, Dublin 4Apr 2026€560,000147 m
70 Simmonscourt Sq, Ballsbridge, Dublin 4Apr 2026€550,000147 m
63 Simmonscourt Sq, Ballsbridge, Dublin 4Apr 2026€545,000147 m
22 Simmonscourt Sq, Ballsbridge, Dublin 4Apr 2026€790,000204 m
7 Simmonscourt Rd, Ballsbridge, Dublin 4Mar 2025€547,000210 m
7a Simmonscourt, Simmonscourt Rd, BallsbridgeMar 2025€391,000210 m
10a Simmonscourt, Simmonscourt Rd, BallsbridgeMar 2025€401,000227 m
10 Simmonscourt Rd, Ballsbridge, Dublin 4Mar 2025€561,000227 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received1 March 2024
  2. Decision due25 April 2024
  3. Decision issued25 April 2024
  4. Permission expiry13 July 2029

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.