GrantedOtherDecided 24 July 2018

Site within the overall RDS Lands, Ballsbridge, Dublin 4

Redevelopment of the Anglesea Stand at the RDS to provide a new three-level grandstand.

3144/18 · Dublin City Council · Lodged 30 May 2018

Reference
3144/18
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
30 May 2018

Summary

AI-generated

The project involves the demolition of the existing Anglesea Stand and associated structures to construct a new three-level grandstand with a 6,481-person capacity. The development also includes a two-story hospitality building, a club shop, and a substation within the curtilage of a protected structure.

Otherstadiumdemolitionprotected structure
Storeys
3
Floor area
8,604 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Protected structure: the development will consist of the redevelopment of the anglesea stand to provide a new 3 level grandstand (6,481 person capacity), a 2 level (storey) hospitality and services building (pocket building) over basement, a club shop and substation (overall 8,604sq. M. [enclosed areas 2,805.3sq. M. , concourse areas 2,721.7sq. M. With views facing onto the judging rings, external upper and lower tier of stand 3,077sq. M. ]) with concrete, painted steel, metal panels, render and glass finishes to structures. The proposal will comprise: a) demolition of the existing anglesea stand and anglesea terrace structure (approx. 7,716sq. M. ), 'lean-to' open fronted shed bounding simmonscourt road (approx. 145sq. M. ) and removal of modern terrace (approx. 44sq. M. ) area surrounding the clock tower (a protected structure); b) provision of a new grandstand (7,332.2sq. M. ) over 3 levels, 21.3m [26.8m od] in height (with associated floodlighting and acoustic public address within roof of new stand) with a connection (via a glazed bridge link at level
  • To the pocket building of (1,204.3sq. M. Gfa) comprising a 2 level (storey) 9.91m [15.41m od] in height building with plant (89sq. M. ) at roof level (within a louvered cover - overall height 10.66m 16.12m od)) to the east. The proposal will include the following flexible ancillary accommodation net sq. M. Areas (for new grandstand and pocket building): security/control rooms (c. 13.3m); media, players and officials facilities (c. 356.7sq. M. [217.8sq. M. In horseshow model]); corridor/circulation areas (c. 74.7sq. M. [30.7sq. M. In horseshow model]); bar/server areas (c. 994.2sq. M. [1,185.8sq. M. In horseshow model]); wc facilities [including disabled & staff facilities] (c. 719.7sq. M. ); stores/coldrooms (c. 217.7sq. M. ); season ticket/vip hospitality areas (c. 56.1sq. M. ); ancillary plant/electric areas (c. 109.5sq. M. ); the internal arrangement of the pocket building (and ancillary areas) will be flexible to accommodate rugby and horse show requirements/events; c) a single storey substation (c. 18.4sq. M. ) 3.6m. In height [9.92m od] located to the east of existing south stand; and a single storey double height club shop (c. 49.1sq. M. ) 6.7m. In height [12.2m od] located adjacent to existing rds office building; d) terrace areas level 00 (396sq. M. ) and level 01 (92sq. M. ) within pocket building on southern façade as well as views from all levels towards parade rings from grandstand and pocket building. E) provision of signage zones (overall 135.5sq. M. ) to north (16sq. M. ) and south (115sq. M. ) elevations of proposed anglesea stand and north (2sq. M. ) and east (2.5sq. M. ) elevations of proposed club shop; f) revised landscaping to the north of anglesea stand and external areas; g) revisions to surface water/drainage/attenuation/storage arrangements including all associated site development and landscaping works; and h) access arrangements and parking provision as per the established layout and operation of the rds complex

Land-use zoning

What this land is zoned for

Z9: Amenity/Open Space Lands/Green NetworkOS
To preserve, provide and improve recreational amenity, open space and ecosystem services.

National zoning type: Mixed/general 'green'/recreation/conservation, other

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
70 Simmonscourt Sq, Ballsbridge, Dublin 4Apr 2026€550,000138 m
63 Simmonscourt Sq, Ballsbridge, Dublin 4Apr 2026€545,000138 m
72 Simmonscourt Sq, Ballsbridge, Dublin 4Apr 2026€560,000138 m
22 Simmonscourt Sq, Ballsbridge, Dublin 4Apr 2026€790,000196 m
7 Simmonscourt Rd, Ballsbridge, Dublin 4Mar 2025€547,000199 m
7a Simmonscourt, Simmonscourt Rd, BallsbridgeMar 2025€391,000199 m
10a Simmonscourt, Simmonscourt Rd, BallsbridgeMar 2025€401,000215 m
10 Simmonscourt Rd, Ballsbridge, Dublin 4Mar 2025€561,000215 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received30 May 2018
  2. Decision due24 July 2018
  3. Decision issued24 July 2018
  4. Grant issued31 August 2018

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.