3, Ardee Road, Rathmines, Dublin 6
Demolition of a warehouse and construction of a 5 to 7-storey Build-to-Rent shared living development with 102 bedspaces.
3567/19 · Dublin City Council · Lodged 23 July 2019
- Reference
- 3567/19
- Authority
- Dublin City Council
- Register status
- Appealed
- Type
- Permission
- Received
- 23 July 2019
- Floor area
- 102 m²
Summary
AI-generatedThe development proposes the demolition of an existing warehouse and office building. It will be replaced by a part 5 to part 7-storey Build-to-Rent shared living facility containing 102 bedspaces, communal living areas, a gym, and roof gardens.
- Residential units
- 102
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
Permission for a build-to-rent shared living residential development at a 0.0796 ha site. The development will principally consist of: the demolition of the existing part 1 to part 2 no. Storey warehouse/office building (c. 764 sq m) and the construction of part 5 to part 7 no. Storey over basement build-to-rent shared living residential development comprising 102 no. Bedspaces (92 no. Single occupancy rooms, 2 no. Accessible rooms, 2 no. Double occupancy rooms and 2 no. Premium double occupancy rooms) with circulation core a roof level (3,736 sq m). The development also consists of the provision of a communal living/kitchen/dining room at each floor level from ground floor to sixth floor level to serve the residents of each floor; communal resident amenity spaces for all residents including gymnasium and party/function/cinema room at basement level and a games lounge and reception/lounge at ground floor level; a roof garden at fifth floor level (105.5 sq m) facing north, east and south; vegetable garden/landscaped amenity areas at roof level facing all directions (138.2 sq m); a 4.5 sq m balcony facing south and west off the communal living/kitchen/dining rooms at each level from first to sixth floor levels; resident facilities including laundrette, linen stores, accessible wc and bin storage; delivery bay; bicycle parking; boundary treatments; hard and soft landscaping; photovoltaic panels; plant; lighting; and all other associated site works and service connections above and below ground.
Land-use zoning
What this land is zoned for
“To provide for and improve mixed-services facilities.”
National zoning type: District, neighbourhood centre
Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.
Read the zoning objectives in the development planBuilt & sold
What happened next
Beyond the decision: whether this development was built, and what property here has sold for.
Built — construction complete
A commencement notice records works starting on 11 July 2022. A completion certificate was lodged on 27 June 2024.
Notified floor area: 3,779 m²
Recent sales nearby
within 500 m| Address | Date | Price | Distance |
|---|---|---|---|
| 12 Ardee Court, Ardee Road, Rathmines | Aug 2025 | €505,000 | 61 m |
| 8 Ardee Court, Ardee Rd, Rathmines Dublin 6 | Jun 2026 | €517,000 | 66 m |
| 6 Ardee Grove, Rathmines, Dublin 6 | Oct 2025 | €491,000 | 66 m |
| Apt 8b, The Park Military Rd, Rathmines Dublin 6 | Jun 2025 | €471,000 | 90 m |
| 12 Lissenfield, Rathmines, Dublin 6 | Mar 2025 | €500,000 | 155 m |
| Apt 6, Lissonfield, Rathmines | Apr 2026 | €590,000 | 166 m |
| Apt 18 - Rathmines Wood, Ardee Road, Rathmines | Mar 2026 | €413,000 | 167 m |
| Flat 1, 1 Williams Park, Dublin 6 | Jun 2026 | €1,455,000 | 178 m |
Nearby properties, not this site — a guide to local values.
Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.
Key dates
Timeline
- Application received23 July 2019
- Decision due16 September 2019
- Decision issued16 September 2019
- Grant issued10 February 2020
- Appeal submitted17 October 2019
- Appeal decided10 February 2020
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- InvalidAt this site
Permission for development to amend a permitted Build to Rent Shared Living Residential Development at a c.…
3, Ardee Road, Rathmines, Dublin 6
5055/23Dublin CityLodged 22 Dec 2023Alterations
- GrantedAt this site
Permission for development to amend a permitted Build-to-Rent Shared Living Residential Development at a c.…
3, Ardee Road, Rathmines, Dublin 6
5277/22Dublin CityLodged 24 Nov 2022Apartments
- GrantedAt this site
Permission for development to amend a permitted Build to Rent Shared Living Residential Development at a…
3 Ardee Road, Rathmines, Dublin 6
3160/24Dublin CityLodged 8 Feb 2024Alterations
- RefusedAt this site
Permission for a Shared Living Residential Development at a 0.0796 Ha site at No. 3 Ardee Road, Rathmines,…
3, Ardee Road, Rathmines, Dublin 6
4090/18Dublin CityLodged 4 Oct 2018Apartments
- InvalidAt this site
Bartra Property (Rathmines) Limited intend to apply for permission for a Build-to-Rent shared living…
No. 3 Ardee Road, Rathmines, Dublin 6
3233/19Dublin CityLodged 11 Jun 2019Apartments
- Invalid40 m away
Installation of repurposed shipping container (15m2) for use as Coffee Shop with external seating area (18m2)…
Hilton House, Ardee Road, Rathmines, Dublin 6, D06 FK18
WEB1940/25Dublin CityLodged 28 Apr 2025Commercial
- Invalid40 m away
The development will consist of: A) Internal modifications to the existing 611sqm office building, B)…
Hilton House, Ardee Road, Rathmines, Dublin 6 D06 FK18
2996/21Dublin CityLodged 18 Jun 2021Change of use
- Granted40 m away
The development will consist of: A) Internal modifications to the existing 611sqm office building, B)…
Hilton House, Ardee Road, Rathmines, Dublin 6 D06 FK18
3041/21Dublin CityLodged 28 Jun 2021Change of use
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedApartments
Permission for a Build-to-Rent Shared Living Residential Development at a 0.22 Ha site. The development will…
0.22 Ha site at 98, Merrion Road, Dublin 4
3019/20Dublin CityLodged 15 Jul 2020
- RefusedApartments
Permission for development, comprising the provision of a Build to Rent Shared Living accommodation scheme…
69-73, Harold's Cross Road, Harold's Cross, Dublin 6W
3592/19Dublin CityLodged 25 Jul 2019
- InvalidApartments
Permission for development , comprising the provision of a Build to Rent shared living accommodation scheme…
69-73, Harold's Cross Road, Harold's Cross, Dublin 6W
3446/19Dublin CityLodged 9 Jul 2019
- GrantedApartments
Permission for a strategic housing development consisting of the demolition all existing buildings on site…
0.2768 ha site at The Old School House, Eblana Avenue, Dun Laoghaire, Co. Dublin
ABP30424919Dún Laoghaire–RathdownLodged 18 Apr 2019
- RefusedChange of use
The proposed development shall provide for a change of use from commercial to residential comprising: Part…
8, Basin View, Upper Basin Street, Dublin 8
2664/20Dublin CityLodged 1 May 2020
- RefusedApartments
Permission for development which consists of — the demolition of existing first floor office level followed…
West City Centre Office and Retail Park , Seamus Quirke Road , Galway
22290Galway CityLodged 8 Nov 2022
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.