Planning Permission Ireland
GrantedApartmentsDecided 18 May 2023

3, Ardee Road, Rathmines, Dublin 6

Amendments to a permitted Build-to-Rent shared living development in Rathmines.

5277/22 · Dublin City Council · Lodged 24 November 2022

Reference
5277/22
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
24 November 2022

Summary

AI-generated

The development consists of minor amendments to a permitted scheme. This includes increasing the basement size by 22 sq m, raising the lift overrun height, changing window positions and materials on the eastern elevation, and altering internal layouts.

Apartmentsrathminesbuild to rentamendment
Floor area
22 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Permission for development to amend a permitted build-to-rent shared living residential development at a c. 0.076 ha site at no. 3 ardee road, rathmines, dublin
  • The development will principally consist of minor amendments to the permitted scheme (dcc reg. Ref. 3567/19; abp ref: 305659-19) , principally comprising an increase in the size of the basement by 22 sq m from 400 sq m to 422 sq m ; an increase in height to the lift overrun by 625 mm; elevational changes including relocated window positions on the eastern elevation from first to sixth floor levels and changes to materials; amendments to the internal layout at basement and ground floor levels; amendments to the waste and cycle area along the northern boundary; and all associated changes above and below ground

Land-use zoning

What this land is zoned for

Z4: Key Urban Villages/Urban VillagesDC
To provide for and improve mixed-services facilities.

National zoning type: District, neighbourhood centre

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 11 July 2022. A completion certificate was lodged on 27 June 2024.

Notified floor area: 3,779

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
12 Ardee Court, Ardee Road, RathminesAug 2025€505,00061 m
8 Ardee Court, Ardee Rd, Rathmines Dublin 6Jun 2026€517,00066 m
6 Ardee Grove, Rathmines, Dublin 6Oct 2025€491,00066 m
Apt 8b, The Park Military Rd, Rathmines Dublin 6Jun 2025€471,00090 m
12 Lissenfield, Rathmines, Dublin 6Mar 2025€500,000155 m
Apt 6, Lissonfield, RathminesApr 2026€590,000166 m
Apt 18 - Rathmines Wood, Ardee Road, RathminesMar 2026€413,000167 m
Flat 1, 1 Williams Park, Dublin 6Jun 2026€1,455,000178 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received24 November 2022
  2. Decision due18 May 2023
  3. Decision issued18 May 2023
  4. Permission expiry11 August 2028

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.