Planning Permission Ireland
RefusedChange of useDecided 26 January 2024

27-32 Parliament Street, Dublin 2, 1-2 Essex Gate, Dublin 8, 7-10 Exchange Street Upper, Dublin 8

Change of use and expansion of protected structures to create a hotel extension on Parliament Street.

4260/23 · Dublin City Council · Lodged 3 August 2023

Reference
4260/23
Authority
Dublin City Council
Register status
Appealed
Type
Permission
Received
3 August 2023

Summary

AI-generated

The project involves changing the use of office, vacant restaurant, and residential spaces into a hotel to integrate with the existing Paramount Hotel. The development spans several protected structures and will provide 28 new bedrooms from first to fourth floor levels, plus 5 bedrooms in a new fifth-floor setback level.

Change of usehotelprotected structureheritagecity centre
Storeys
5

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Protected structure : permission for development on lands at nos. 27-32 parliament street (nos. 27, 28 & 31 being protected structures) dublin 2, 1-2 essex gate (both protected structures) dublin 8, 7-10 exchange street upper (nos. 9 & 10 being protected structures) dublin
  • The proposed development comprises the following: (a) change of use from office to hotel at 31 parliament street (a protected structure) and from vacant restaurant and residential use to hotel at 32 parliament street. The hotel use will integrate nos. 31 and 32 into the existing paramount hotel and will comprise a new hotel entrance on parliament street, a foyer and reception at ground floor level, administration areas at basement level and the collective amalgamation of both properties with paramount hotel at all existing floor levels to provide 28 no. New bedrooms from first to fourth floor levels and the addition of 5 no. Bedrooms in a new setback floor behind exiting roof hips at fifth floor level; (b) the proposal involves the reconfiguration of the internal layout of 29-30 parliament street to incorporate a new opening in the existing wall with 31 parliament street resulting in a change from a double bedroom to a single bedroom and reconfiguration of the store room with the addition of hallway doors from first to fourth floor level; (c) demolition of the single storey rear extensions of nos. 31 and 32 parliament street and addition of a new courtyard with fully glazed roof extending across the rear of nos. 31 and 32; (d) reconstruction of the existing front facade of nos. 31 and 32 parliament street from first to fourth floor level (no changes proposed to existing protected bay window and ground floor shop front of no. 31); (e) internal alterations at basement and ground floor levels in all properties except for nos. 27-30 parliament street where no changes are proposed; (f) extension of existing setback of 7-8 exchange street upper at fourth floor level to the street front to match the existing frontage to include the reconfiguration of the internal layout to provide 4 no. Bedrooms and lobby; (g) addition of a setback fifth floor level with the provision of a terrace enclosed by a glass balustrade at 7-8 exchange street upper to include the addition of 3 no. Bedrooms, lobby, lift and new staircase. New flat roof over fifth floor with setback louvred plant area in centre of roof to be provided; (h) provision of 10 no. Signage zones on frontages of parliament street, essex gate and exchange street upper. The overall development will result in a hotel bedroom count of 108 no. Bedrooms (66 existing and 42 proposed) and includes all associated alterations to the existing hotel services and all associated site development works above and below ground

Land-use zoning

What this land is zoned for

Z5: City CentreUC
To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.

National zoning type: City/Town/village Centre, central area

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Apt 1, The Cutlers, 3 6 Exchange St Upper Dublin 2Oct 2025€359,00016 m
7 The Cutlers, Exchange St., Dublin 8Jun 2025€370,00016 m
Apt 6c, Isoldes Tower, Temple BarAug 2025€470,00035 m
5 The Wooden Buildings, Essex St, Temple Bar Dublin 2Oct 2025€505,00044 m
17 The Wooden Building, Exchange St Upper, Dublin 8Oct 2025€1,300,00044 m
3 Royal Exchange, Parliament St, Dublin 2Dec 2025€315,00048 m
Apt 18, Royal Exchange Building, Parliament St Dublin 2Sept 2025€335,00048 m
Apt 9, Royal Exchange Building, Parliament StApr 2026€295,00048 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received3 August 2023
  2. Decision due26 January 2024
  3. Decision issued26 January 2024
  4. Appeal submitted21 February 2024
  5. Appeal decided4 April 2025
  6. Permission expiry18 May 2030

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.