Planning Permission Ireland
GrantedCommercialDecided 4 February 2020

Nos. 27-32 Parliament Street (Nos. 27, 28 & 31 being Protected Structures) Dublin 2, 1-2 Essex Gate (Both Protected Structures) Dublin 8, and 7-10 Exchange Street Upper (Nos. 9 &10 being Protected Structures) Dublin 8.

Internal alterations and change of use to increase hotel bedrooms across protected structures on Parliament Street.

4598/19 · Dublin City Council · Lodged 2 December 2019

Reference
4598/19
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
2 December 2019
Floor area
5 m²

Summary

AI-generated

The proposal involves ground-floor facade alterations and changing the use of 68 sqm of internal space, including a stairwell and linen store, into hotel bedrooms. This will increase the permitted hotel capacity from 117 to 122 bedrooms over six storeys.

Commercialhotelheritagerefurbishment
Storeys
6

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Protected structure: the proposed development comprises: a) façade alterations at ground level nos. 30 & 29 parliament street with new proposed door to existing shop front, b) change of use from first to fourth floor of the existing north facing stairwell to 4 no. Hotel bedrooms (one at each of the floor level),and c) change of use at fifth floor level linen store to hotel bedroom and small internal reconfigurations of linen and cleaner store around the eastern stairwell. The total amount of change of use floor space equates to 68 sqm. The hotel bedroom count will increase from previously approved 117 bedrooms (as permitted with reg. Ref. 3778/17) to 122 bedrooms over 6 storeys.

Land-use zoning

What this land is zoned for

Z5: City CentreUC
To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.

National zoning type: City/Town/village Centre, central area

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
7 The Cutlers, Exchange St., Dublin 8Jun 2025€370,00018 m
Apt 1, The Cutlers, 3 6 Exchange St Upper Dublin 2Oct 2025€359,00018 m
Apt 6c, Isoldes Tower, Temple BarAug 2025€470,00034 m
5 The Wooden Buildings, Essex St, Temple Bar Dublin 2Oct 2025€505,00046 m
17 The Wooden Building, Exchange St Upper, Dublin 8Oct 2025€1,300,00046 m
3 Royal Exchange, Parliament St, Dublin 2Dec 2025€315,00047 m
Apt 18, Royal Exchange Building, Parliament St Dublin 2Sept 2025€335,00047 m
Apt 9, Royal Exchange Building, Parliament StApr 2026€295,00047 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received2 December 2019
  2. Decision due4 February 2020
  3. Decision issued4 February 2020
  4. Grant issued20 March 2020

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.