Planning Permission Ireland
GrantedEnergyDecided 10 December 2025

Merlin Park Industrial Estate and Doughiska Road, Townland of Doughiska, Galway Co. Galway

Construction of an energy centre and heat network pipeline in Doughiska.

2560319 · Galway City Council · Lodged 16 October 2025

Reference
2560319
Authority
Galway City Council
Register status
Decided
Type
PERMISSION
Received
16 October 2025

Summary

AI-generated

Permission is sought for an energy centre building integrating low carbon technologies, including air source heat pumps, electric boilers, and gas boilers. The development features roof-mounted solar PV panels on multiple buildings and a heat pipeline network.

Energysolardistrict heatingheat pumpinfrastructure

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Red iii permission for development which consists of: the construction and operation of a development consisting of an energy centre building, heat network pipeline, landscaping works, roof mounted solar pv and all other associated ancillary infrastructure at the merlin park industrial estate and doughiska road, within the townland of doughiska, galway, co. Galway. The galway city east energy centre building will integrate multiple low carbon energy technologies. The development will include the installation of 2no. Air source heat pumps (ashps) each with a 1.5mw capacity, 2 no. Electric boilers, each with a 1.5mw capacity to handle peak loads and temperatures, and 2 no. Gas boilers, each with a 1.5mw capacity for emergency back up support. The proposed energy centre building will have a building height of 6.2m, with solar pv panels mounted on the building rooftop. The adjacent building to the east (smurfit westrock), will have solar pv panels mounted on the building rooftop. The building to the north (value centre), will also have roof mounted solar panels. The proposed development will also include a heat pipeline network consisting of 2no. Pipes, with a maximum diameter of 450mm each, spanning a distance of circa. 2390m in an underground trench, from the proposed energy centre building to doughiska road, along the length of doughiska road, crossing monivea road to the north, terminating outside the clayton hotel, and crossing old dublin road to the south, terminating outside the castlegar gaa club, linking the proposed galway city east energy centre building to future heat customer buildings in the area. Ancillary development will consist of security fencing, access and parking, drainage infrastructure, and landscaping works at the proposed energy centre building. Site preparation will involve foundation works, and construction of essential access facilities to support overall functionality for the purpose of generating renewable heat energy and transmitting it to future heat customer buildings within the townland of doughiska, galway co. Galway (the proposed development). Permission is sought for a ten year construction period.

Land-use zoning

What this land is zoned for

ResidentialRS
To provide residential development and for associated support development, which will ensure the protection of existing residential amenity and will contribute to sustainable residential neighbourhoods

National zoning type: Residential, mixed residential and other uses

Objective set by the Galway City Development Plan 2023 - 2029 (2023–2029). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
178 Fearann Ri, Doughiska, GalwayOct 2025€375,0005 m
190 Fearann Ri, Doughiska, GalwayAug 2025€312,00054 m
5 Doughiska Neighbourhood Centre, Doughiska, GalwayJan 2025€220,00063 m
35 Fearann Ri, Doughiska, Galway CityApr 2026€285,00085 m
41 Fearann Ri, Doughiska, GalwayApr 2026€372,00092 m
43 Fearann Ri, Doughiska, GalwayMay 2026€455,00099 m
144 Fearann Ri, Doughiska, GalwaySept 2025€275,000100 m
4 Fearann Ri, Doughiska, GalwayDec 2025€300,500100 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received16 October 2025
  2. Decision due10 December 2025
  3. Decision issued10 December 2025
  4. Grant issued28 January 2026
  5. Permission expiry27 January 2036

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.