Planning Permission Ireland
Awaiting decisionEnergy

Townland of Coolnafearagh, Monasterevin, Co. Kildare

Construction of a large-scale solar farm spanning 60.36 hectares across Kildare and Laois.

2561050 · Kildare County Council · Lodged 12 September 2025

Reference
2561050
Authority
Kildare County Council
Register status
Invalid or incomplete
Type
PERMISSION
Received
12 September 2025

Summary

AI-generated

The development consists of linear arrays of ground-mounted solar PV panels, 4 single-storey inverter stations, and associated cabling. The solar farm spans 60.36 hectares, with 37.66 hectares in Co. Kildare and 22.7 hectares in Co. Laois, seeking a 10-year permission with a 40-year operational period.

Energysolarrenewable energysolar farm
Storey
1

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • For
  • Linear arrays of solar pv panels on ground mounted steel supported structures with associated cabling and ducting
  • 4 no. Proposed single storey inverter stations
  • All associated underground cabling (within and between land parcels), including onsite control and switch gear room
  • Site perimeter fencing
  • 2 no. New site entrances with palisade double security gates
  • 2 no. Temporary construction compound/carpark/material storage areas with associated temporary site offices, parking areas and security fencing
  • 3 no. Temporary and 1 no. Permanent steel storage containers
  • Site access tracks including passing and turning bays
  • On-site pole mounted cctv cameras
  • 2 no. Bottomless culverts
  • 2 no. Temporary construction stage moby dick type wheel wash systems
  • 1 no. Concrete wash out location (within the westernmost temporary construction compound); and
  • All associated and ancillary works. The proposed solar farm development spans a total site area measuring 60.36 ha, of which 37.66 ha is located in co. Kildare and 22.7 ha is located in co. Laois. Permission is sought for a period of 10 years with an operational period of 40 years. The total capacity of solar pv on the site is estimated to be 32 mw

Key dates

Timeline

  1. Application received12 September 2025

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.