THE TOWNLANDS OF DOVEHILL GORTNAMUCK, CURRAGHMORE (EGLISH BY) AND FREAGH, CO. OFFALY
Development of a solar farm across three land parcels totaling approximately 181 hectares.
22622 · Offaly County Council · Lodged 5 December 2022
- Reference
- 22622
- Authority
- Offaly County Council
- Register status
- Withdrawn
- Type
- PERMISSION
- Received
- 5 December 2022
Summary
AI-generatedA 10-year permission and 40-year operation is sought for a solar farm on three land parcels. The development includes over 1 million square meters of solar panels, underground cabling, control buildings, and site entrances.
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
A 10-year permission and 40 year operation for a solar farm on 3 no. Land parcels as described herein: west parcel (dovehill townland) c. 119.25 hectares, central parcel (gortnamuck & curraghmore (eglish by) townlands) c. 42.2 hectares and east parcel (gortnamuck & freagh townlands) c. 16.07 hectares; a route corridor of 3.5 hectares for an underground internal electrical cable connecting the west and central parcels to the east parcel consisting of c. 3,859m underground cabling within the corridor of the l6042 'rath road' public road. The total site area for the proposed development is c. 181.02 hectares and consists of the following;1,070,756 sq. Metres of solar photovoltaic panels on ground mounted steel frames; inverter / transformer stations; underground power and communication cables and ducts; boundary security fencing; 2 no. Medium voltage (mv) control buildings; new internal access tracks associated drainage infrastructure; site entrances to the l6042 'rath road' public road; 54 no. Cctv/ lighting posts and all associated site services and works. Installations of internal network cable comprise trenching for an underground medium voltage electrical cable and associated joint bays and infrastructure, for a distance of approximately 3,859 metres in length along the l6042 'rath road' public road and approximately 661.5 metres within the solar farm lands. The proposed solar farm will be broken into 2 no. Separate phases. 'phase 1' will consist of the development of the solar pv arrays located in the east parcel (c. 16.07 ha), central parcel (c. 42.2 ha) and the west parcel (c. 52.67 ha). 'phase 2' of the solar farm will consist of the development of the remainder of the solar pv arrays in the west parcel covering a site area of c. 66.58 ha. As part of a separate strategic infrastructure development (sid) planning application, provision of a 110kv electrical substation with electrical control building, associated compound with palisade fence and 2 no. Overhead line masts, which is to be located in the east parcel, will be lodged with an bord pleanála in due course
Key dates
Timeline
- Application received5 December 2022
- Application withdrawn21 December 2022
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- Awaiting decision160 m away
A 10-YEAR PERMISSION AND 40 YEAR OPERATION FOR A SOLAR FARM ON 3 NO. LAND PARCELS AS DESCRIBED HEREIN: WEST…
THE TOWNLANDS OF DOVEHILL GORTAMUCK CURRAGHMORE (EGLISH BY) AND , FREAGH , CO. OFFALY
22586OffalyLodged 11 Nov 2022Energy
- Granted470 m away
10-YEAR PERMISSION AND 40 YEAR OPERATION FOR A SOLAR FARM ON 3 NO. LAND PARCELS AS DESCRIBED HEREIN: WEST…
THE TOWNLANDS OF DOVEHILL GORTNAMUCK CURRAGHMORE (EGLISH BY) , AND FREAGH , CO. OFFALY
2374OffalyLodged 24 Feb 2023Energy
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedEnergy
10-YEAR PERMISSION AND 40 YEAR OPERATION FOR A SOLAR FARM ON 3 NO. LAND PARCELS AS DESCRIBED HEREIN: WEST…
THE TOWNLANDS OF DOVEHILL GORTNAMUCK CURRAGHMORE (EGLISH BY) , AND FREAGH , CO. OFFALY
2374OffalyLodged 24 Feb 2023
- Awaiting decisionEnergy
A 10-YEAR PERMISSION AND 40 YEAR OPERATION FOR A SOLAR FARM ON 3 NO. LAND PARCELS AS DESCRIBED HEREIN: WEST…
THE TOWNLANDS OF DOVEHILL GORTAMUCK CURRAGHMORE (EGLISH BY) AND , FREAGH , CO. OFFALY
22586OffalyLodged 11 Nov 2022
- GrantedEnergy
APPLY FOR A 10 YEAR PERMISSION AND 40 YEAR OPERATION FOR A SOLAR FARM OF 146.6 HECTARES, ON 3 NO. LAND…
BALLYMACASY COOLNAGRAIGUE BALLYLINE EAST , BALLYLINE WEST , LEANAMORE AND DROMALIVAUN
23284KerryLodged 16 Mar 2023
- RefusedEnergy
A 10-year permission and 35 year operation for a solar farm on four land parcels as described herein; North…
Ballyvalode Garryduff Gortnakistin Gortyvahane Keelogs Kilmacogue Moanoola and Moanroe , Co. Limerick
211565LimerickLodged 12 Nov 2021
- RefusedEnergy
A 10 YEAR PERMISSION (TO CONSTRUCT DEVELOPMENT) FOR A SOLAR FARM COMPRISING THE INSTALLATION OF PHOTOVOLTAIC…
TOWNLANDS OF GORMAGH AND CULLEEN , TULLAMORE , CO. OFFALY
22387OffalyLodged 3 Aug 2022
- RefusedEnergy
THE DEVELOPMENT A SOLAR PV FARM AND BATTERY STORAGE FACILITY. THE PROPOSED DEVELOPMENT WILL BE COMPRISED OF…
PALLAS , KILFEIGHNY SOUTH AND GLANOE , CO KERRY
201284KerryLodged 23 Dec 2020
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.