Planning Permission Ireland
Awaiting decisionInfrastructure

Former Roadstone Carrolls Cross Quarry, Greenan and Ballyshanock, Waterford

Restoration of a 2.37-hectare quarry void using inert soil and stone or soil by-products.

2360209 · Waterford City and County Council · Lodged 22 May 2023

Reference
2360209
Authority
Waterford City and County Council
Register status
Invalid or incomplete
Type
PERMISSION
Received
22 May 2023

Summary

AI-generated

The proposal involves restoring a 2.37-hectare quarry void within a 4.7-hectare site using inert soil, stone, or soil by-products. Works include removing an onsite silo, relocating a groundwater monitoring well, and installing culverts near the Dawn River and Waterford Greenway.

Infrastructurequarryland restorationwaste management

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • The restoration of part of an exhausted quarry void located within the former rock quarry at carroll’s cross in the townland(s) of greenan and ballyshanock. The application area will be ca. 4.7 hectares and the void which will be subjected to restoration covers an area of ca. 2.37ha. The development will consist of the restoration of the void with either
  • Inert soil and stone waste (imported inert greenfield and non-greenfield soils and stone, and river dredge spoil) which will result in the proposed development operating as a soil recovery facility that requires a waste management licence from the epa; or
  • Soil and stone by-product (i. E. Essentially virgin soil or equivalent to virgin soil and stone) which will be notified to the epa as an article 27 by-product at its source of origin and transported as a by-product material to enable the site to be restored. The site would then operate under conditions of planning. The proposed works will also involve the removal of an existing silo onsite, the relocation of a groundwater monitoring well, installation of road pipe culvert in the dawn river and amendments to the existing culvert crossing the waterford greenway (including the construction of onsite access ramps approaching the existing culvert either side of the greenway), along with ancillary works and landscaping. The area of the site which will be restored currently comprises of exposed and disturbed rock from past quarry activities. The site will be restored to species rich grassland which may be subjected to low level grazing. A planning permission of 15 years is being sought for the proposed development

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Carroll's Cross Roads, Lisnagon, CarnarossDec 2025€110,000156 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received22 May 2023

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.