Awaiting decisionEnergyDecision due in ~46 weeks (9 June 2027)

MOMEEN & LETTERGULL, LIFFORD PO, CO. DONEGAL

Addition of a 135m wind turbine and associated infrastructure to the permitted Lettergull Wind Farm.

2660788 · Donegal County Council · Lodged 1 May 2026

Reference
2660788
Authority
Donegal County Council
Register status
In progress
Type
PERMISSION
Received
1 May 2026

Summary

AI-generated

Permission is sought for a renewable energy development adjoining the permitted Lettergull Wind Farm. The project comprises one wind turbine with a blade tip height of 135m, turbine foundations, hard-standing areas, a new access track, a temporary construction compound, and underground cabling.

Energywind farmturbinerenewable
Storey
1

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Development on lands within and adjoining the permitted lettergull wind farm (planning ref. No. 18/50156, acp ref. 304685-19) which will comprise of the provision of a renewable energy development consisting of the following: (1) 1 no. Wind turbine with an overall blade tip height of 135m, rotor diameter of 115m, and a hub height of 77.5m, (2) turbine foundation and associated hard-standing areas, (3) temporary works to the existing lettergull wind farm site access (as permitted under planning ref. No. 18/50156, acp ref. 304685-19) to facilitate the construction of the proposed wind turbine consisting of the removal and reinstatement of fencing and landscaping and temporary widening of the site access junction, (4) provision of new site access track connecting the proposed wind turbine to the existing internal lettergull wind farm site access tracks (as permitted under planning ref. No. 18/50156, acp ref. 304685-19), (5) temporary construction compound and temporary laydown area, (6) associated underground electrical and communications cabling connecting the proposed wind turbine to the permitted on-site 38kv substation (as permitted under planning ref. No. 18/50156, acp ref. 304685-19), (7) site drainage, (8) access gates, fencing and signage and (9) all related site works above and below ground and all ancillary development. Following a thirty-year operational life from the date of full commissioning of the wind turbine the proposed wind turbine and associated underground electrical and communications cabling will be decommissioned. The development will be accessed via the existing lettergull wind farm site entrance on the r236 regional road and existing internal lettergull wind farm site access tracks (as permitted under planning ref. No. 18/50156, acp ref. 304685-19). An environmental impact assessment report (eiar) and natura impact statement (nis) accompany this application. The eiar and nis assess the full extent of the proposed development as described in (1)
  • (9) above as well as the temporary accommodation works to facilitate the delivery of turbine components from the port of killybegs to the existing site entrance via the national (n56, n15 and n14) regional (r263 and r236) public road network in county donegal. The development is covered by the provisions of the (red iii) renewable energy directive iii (directive (eu) 2023/2413)

Key dates

Timeline

  1. Application received1 May 2026
  2. Decision due9 June 2027

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.