Awaiting decisionEnergy

CROAGHNASHALLOG, DUNGLE, LETTERKENNY PO

A 5-turbine wind farm development with a 35-year operational life near Dungloe.

2660660 · Donegal County Council · Lodged 16 April 2026

Reference
2660660
Authority
Donegal County Council
Register status
Invalid or incomplete
Type
PERMISSION
Received
16 April 2026

Summary

AI-generated

The proposal seeks a 10-year planning permission for a wind farm consisting of five turbines with a maximum tip height of 86m and a total capacity of 4.9 MW. The project includes an on-site substation, 2.5km of underground cabling, access tracks, and associated infrastructure on a 25.24-hectare site.

Energywind farmwind turbinerenewable energyinfrastructure

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

10 year planning permission and a 35 year operational life for the installation and operation of five (5) wind turbines, each with a maximum tip height of 86m and a total capacity of 4.9 mw, construction of associated foundations, crane bases, and hardstanding areas (total area approximately 2,625 m²), on-site medium voltage (mv) substation to esb networks specifications, with approximately 2.5km of underground 20kv cable connecting to the existing esb dungloe 38kv substation, construction of approximately 2km of internal access tracks, installation of on-site spoil deposition areas, laydown areas, and temporary construction compound, including welfare facilities and materials storage, provision of service access for light vehicles via the existing diamond road, provision of temporary delivery access via the existing n56, installation of approximately 1.2km of underground cabling connecting the turbines and erection of site signage and all ancillary site development works. The site of the proposed development has a total area of c. 25.24 hectares. The development is covered by the provisions of the (red iii) renewable energy directive iii (directive (eu) 2023/2413). A natura impact statement (nis) accompanies this application

Key dates

Timeline

  1. Application received16 April 2026

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.