Planning Permission Ireland
Exempt — no permission neededNew dwellingDecided 23 October 2025

Rear of 23 Harrington Street and to the side of 12 Stamer Street, Dublin 8

Demolition of a shed and construction of two semi-detached houses.

0426/25 · Dublin City Council · Lodged 29 September 2025

Reference
0426/25
Authority
Dublin City Council
Register status
Decided
Received
29 September 2025

Summary

AI-generated

The application seeks retention permission for the demolition of a single-storey shed. It also seeks permission for alterations to a previously approved development to construct two three-storey over basement semi-detached houses.

New dwellingdemolitionsemi detachedbasement
Residential units
2
Storeys
4

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Shec: retention permission is sought for the demolition of a single storey shed structure to the rear of no. 23 harrington street and to the north of no. 12 stamer street. Permission is sought for alterations to a previously granted residential development under reg. Ref. 3815/23. The alterations proposed include: (i) construction of 2 no. Three-storey over basement semi-detached residential dwellings (1 no. 3 bed unit (house type a) and 1 no. 4 bed unit (house type b). (ii) house a provides for private open space at basement and ground floor with a terrace at second floor level (totalling 36.2 sqm) and house b provides for private open space at ground floor level with a terrace at second floor level (totalling 40.7 sqm). (iii) provision is made for bin stores and secure bicycle parking spaces for each unit within the curtilage of the site. (iv) the proposal also includes alterations to the existing boundary wall including the omission of the existing vehicular entrance to provide for a pedestrian entrance to house a and separate pedestrian entrance to house b; and (v) all associated works, including boundary treatments, landscaping, drainage and engineering works necessary to facilitate the development.

Key dates

Timeline

  1. Application received29 September 2025
  2. Decision due24 October 2025
  3. Decision issued23 October 2025

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.