Planning Permission Ireland
GrantedRetentionDecided 30 March 2021

22, Baggot Street Upper, Dublin 4

Retention of a timber fence and bin store enclosure at the rear of a protected structure.

2164/21 · Dublin City Council · Lodged 5 February 2021

Reference
2164/21
Authority
Dublin City Council
Register status
Decided
Type
Retention Permission
Received
5 February 2021

Summary

AI-generated

Temporary three-year retention permission is sought for a timber fence and bin store enclosure built to the rear of a protected structure. The perimeter fence is 2.4m high, extending 15.5m along the north/west boundary and 6m along the north/east boundary.

Retentionretentionprotected structurefence

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Protected structure & retention: eatilicious limited intend to apply for a temporary 3 year permission for retention for development at this site, at 22 upper baggot street (protected structure) extending to eastmoreland lane, dublin
  • The development consists of the retention of a timber fence and enclosure to bin store constructed to the rear of the property, which is a protected structure. The perimeter timber fence is on the north/west boundary with the neighbouring property no. 20 baggot street upper and on the north/east boundary with eastmoreland lane. The timber fence is 2.4m in height and 15.5m in length on the north/west boundary and 6m in length on the north/east boundary

Land-use zoning

What this land is zoned for

Z4: Key Urban Villages/Urban VillagesDC
To provide for and improve mixed-services facilities.

National zoning type: District, neighbourhood centre

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
29 Haddington Rd, Dublin 4, DublinJun 2025€1,640,00068 m
42 Eastmoreland Court, Ballsbridge, Dublin 4Feb 2025€540,000108 m
24 Eastmoreland Court, Eastmoreland Place, Dublin 4Jun 2025€325,000108 m
12 Eastmoreland Place, Dublin 4Dec 2025€650,000115 m
7 Pembroke Rd, Dublin 4, DublinDec 2025€2,250,000134 m
12 Baggot Lane, Dublin 4, DublinMay 2025€970,000143 m
61 Haddington Rd, Ballsbridge, Dublin 4Apr 2025€1,310,000155 m
Apt 1, Arranmore, 13-17 Pembroke RoadNov 2025€455,000163 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received5 February 2021
  2. Decision due1 April 2021
  3. Decision issued30 March 2021
  4. Grant issued12 May 2021

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.