GrantedInfrastructureDecided 29 July 2019

Adjacent to Berth 49, Ferryport Terminal 1, Dublin Port, Dublin 1

Construction of a new approachway, ramp, office buildings, and demolition of existing staff facilities at Dublin Port.

3176/19 · Dublin City Council · Lodged 4 June 2019

Reference
3176/19
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
4 June 2019

Summary

AI-generated

The development at Dublin Port consists of a 189m long approachway and ramp, a 193 sqm office building, control kiosks, and 15 tug parking spaces. It also involves the demolition of five existing staff facilities buildings totaling 329 sqm, and is accompanied by a Natura Impact Statement.

Infrastructureportinfrastructuredemolitionenvironmental
Floor area
219 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The development will consist of: a c. 189m long, c. 10m wide approachway and ramp; 1 no. Office and staff facilities building (c. 193 sq. M and 7.7m in height); 1 no. Control kiosk (c. 6 sq. M and 2.3m in height); 1 no. Control cabin (c. 20 sq. M and 2.3m in height); new lighting (including 18 no. Lighting columns 10m high); demolition of 5 no. Existing staff facilities buildings with a combined area of c. 329 sq. M; building 1 has an area of c. 198 sq. M, building 2 has an area of c. 10.7 sq. M, building 3 has an area of c. 35.5 sq. M, building 4 has an area of c. 42.4 sq. M, building 5 has an area of c. 42.4 sq. M; and associated site works to include 15 no. Tug parking spaces, drainage, utility services, fencing 2.4m in height and pedestrian gate 2.4m in height on a site of approx. 1.3 hectares. A natura impact statement (nis) will be submitted to the planning authority with the planning application.

Land-use zoning

What this land is zoned for

Z7: Employment (Heavy)SI
To provide for the protection and creation of industrial uses, and facilitate opportunities for employment creation including Port Related Activities.

National zoning type: General industry

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Key dates

Timeline

  1. Application received4 June 2019
  2. Decision due29 July 2019
  3. Decision issued29 July 2019
  4. Grant issued9 September 2019

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.