Adjacent to Berth 49, Ferryport Terminal 1, Dublin Port, Dublin 1
Construction of a new approachway, ramp, office buildings, and demolition of existing staff facilities at Dublin Port.
3176/19 · Dublin City Council · Lodged 4 June 2019
- Reference
- 3176/19
- Authority
- Dublin City Council
- Register status
- Decided
- Type
- Permission
- Received
- 4 June 2019
Summary
AI-generatedThe development at Dublin Port consists of a 189m long approachway and ramp, a 193 sqm office building, control kiosks, and 15 tug parking spaces. It also involves the demolition of five existing staff facilities buildings totaling 329 sqm, and is accompanied by a Natura Impact Statement.
- Floor area
- 219 m²
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
The development will consist of: a c. 189m long, c. 10m wide approachway and ramp; 1 no. Office and staff facilities building (c. 193 sq. M and 7.7m in height); 1 no. Control kiosk (c. 6 sq. M and 2.3m in height); 1 no. Control cabin (c. 20 sq. M and 2.3m in height); new lighting (including 18 no. Lighting columns 10m high); demolition of 5 no. Existing staff facilities buildings with a combined area of c. 329 sq. M; building 1 has an area of c. 198 sq. M, building 2 has an area of c. 10.7 sq. M, building 3 has an area of c. 35.5 sq. M, building 4 has an area of c. 42.4 sq. M, building 5 has an area of c. 42.4 sq. M; and associated site works to include 15 no. Tug parking spaces, drainage, utility services, fencing 2.4m in height and pedestrian gate 2.4m in height on a site of approx. 1.3 hectares. A natura impact statement (nis) will be submitted to the planning authority with the planning application.
Land-use zoning
What this land is zoned for
“To provide for the protection and creation of industrial uses, and facilitate opportunities for employment creation including Port Related Activities.”
National zoning type: General industry
Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.
Read the zoning objectives in the development planKey dates
Timeline
- Application received4 June 2019
- Decision due29 July 2019
- Decision issued29 July 2019
- Grant issued9 September 2019
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- InvalidAt this site
The development will consist of: a c.189m long, c.10m wide approach way and ramp; 1 no. office and staff…
Berth 49, Terminal 1, Dublin Port, Dublin 1
2756/19Dublin CityLodged 15 Apr 2019Infrastructure
- Granted290 m away
The development will consist of : partial demolition of an electrical substation building to include an ESB…
A site located north of Berth 50, Alexandra Road, Dublin Port, Dublin 1
3174/24Dublin CityLodged 12 Feb 2024Infrastructure
- Granted430 m away
The development will consist of a unified State services facility including: 2 no. Inspection Sheds (each…
Former Calor Yard and Ferry Terminals 1 and 2, Dublin Port, Dublin 1
3638/18Dublin CityLodged 1 Aug 2018Infrastructure
- Granted480 m away
The development will comprise of works to the existing Breakwater Road North and Breakwater Road South to…
Dublin Port lands at Breakwater Road South, Dublin Port, Dublin 1
3314/18Dublin CityLodged 20 Jun 2018Infrastructure
- Granted490 m away
Permission is sought for development that will consist of: construction of a bridge to span the existing…
Lands at Berth 47A, adjacent to Pigeon House Road, Dublin 4, north of the Ringsend Wastewater Treatment Works.
3711/18Dublin CityLodged 10 Aug 2018Infrastructure
- Granted500 m away
PERMISSION & RETENTION : Permission for development consisting of the construction of plant, comprising silos…
Pigeon House Road, Dublin 4, D04 FP28
3041/24Dublin CityLodged 15 Jan 2024Industrial
- Invalid500 m away
RETENTION & PERMISSION: Permission for development consisting of the construction of plant, comprising silos…
Pigeon House Road, Dublin 4, D04 FP28
4853/23Dublin CityLodged 27 Nov 2023Industrial
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- InvalidInfrastructure
The development will consist of: a c.189m long, c.10m wide approach way and ramp; 1 no. office and staff…
Berth 49, Terminal 1, Dublin Port, Dublin 1
2756/19Dublin CityLodged 15 Apr 2019
- GrantedIndustrial
The proposed development is located to the south of the development permitted under Reg. Ref.: FW20/0187…
Horizon Logistics Park (on lands known as Site P2), off the R108, at the townland of Silloge, St. Margaret's, Swords, Co. Dublin
FW23A/0250FingalLodged 20 Oct 2023
- GrantedInfrastructure
The development will consist of : partial demolition of an electrical substation building to include an ESB…
A site located north of Berth 50, Alexandra Road, Dublin Port, Dublin 1
3174/24Dublin CityLodged 12 Feb 2024
- GrantedCommercial
Permission for the construction of a new administration building at their existing facility and all ancillary…
Gortroe , Killarney , Co. Kerry
2460709KerryLodged 19 Sept 2024
- GrantedInfrastructure
The development will consist of construction of a new 220kV gas insulated switchgear (GIS) Switchboard…
Poolbeg 220kV Electrical Substation and adjacent land, Pigeon House Road, Dublin 4 on site measuring 3.6haAB[ Ref:.
4057/23Dublin CityLodged 30 Jun 2023
- GrantedCommercial
The development will consist of: i. Construction of 3 no. office buildings with a cumulative gross floor area…
Bennetstown , Pace , Dunboyne Co. Meath
23424MeathLodged 19 Apr 2023
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.