InvalidInfrastructureDecided 7 June 2019

Berth 49, Terminal 1, Dublin Port, Dublin 1

Port infrastructure development at Berth 49, Dublin Port, including a new approach ramp, office buildings, and demolition works.

2756/19 · Dublin City Council · Lodged 15 April 2019

Reference
2756/19
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
15 April 2019

Summary

AI-generated

The development at Berth 49, Terminal 1, Dublin Port, consists of a 189m long approach way and ramp, a new office and staff facilities building, control kiosks, and new lighting. It also includes the demolition of five existing staff buildings totaling 329 sq.m, alongside associated site works on a 1.3-hectare site.

Infrastructureportdemolitioninfrastructure
Floor area
219 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The development will consist of: a c. 189m long, c. 10m wide approach way and ramp; 1 no. Office and staff facilities building (c. 193 sq. M and 7.7m in height); 1 no. Control kiosk (c. 6sq. M and 2.3m in height); 1 no. Control cabin (c. 20sq. M and 2.3m in height); new lighting (including 18 no. Lighting columns 10m high); demolition of 5 no. Existing staff facilities buildings with a combined area of c. 329sq. M; building 1 has an area of c. 198sq. M, building 2 has an area of c. 10.7sq. M, building 3 has an area of c. 35.5sq. M, building 4 has an area of c. 42.4sq. M, building 5 has an area of c. 42.4sq. M; and associated site works to include 15 no. Tug parking spaces, drainage, utility services, fencing 2.4m in height and pedestrian gate 2.4m in height on a site of approx. 1.3 hectares.

Land-use zoning

What this land is zoned for

Z7: Employment (Heavy)SI
To provide for the protection and creation of industrial uses, and facilitate opportunities for employment creation including Port Related Activities.

National zoning type: General industry

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Key dates

Timeline

  1. Application received15 April 2019
  2. Decision due7 June 2019
  3. Decision issued7 June 2019

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.