Planning Permission Ireland
Awaiting decisionAlterationsDecision due in ~6 weeks (4 September 2026)

Unit 6, Miller's Lodge, 33-34 Barrow Street, Dublin 4, D04 PW6W

Placement of mechanical plant equipment on the roof of a protected structure extension.

WEBDSDZ2732/26 · Dublin City Council · Lodged 10 July 2026

Reference
WEBDSDZ2732/26
Authority
Dublin City Council
Register status
In progress
Type
Permission
Received
10 July 2026

Summary

AI-generated

The application proposes placing mechanical plant equipment on the flat roof of a modern extension to a protected structure, rising 500mm above the parapet. Works include opening a non-original rear wall for service access, without altering the structural form of the protected structure.

Alterationsprotected structuresdzmechanical plant

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Protected structure: , the applicant, intend to apply for planning permission for development at this site at unit 6, miller's lodge, 33-34 barrow street, dublin 4, d04 p6w6 which is a protected structure (rps. No. 483/484). The application relates to a proposed development within an sdz planning scheme area. The development will consist of the placement of mechanical plant equipment on the flat roof of the modern extension to a level 500mm above the height of the existing parapet, to the north and west of the protected structure. The works will include the opening of a reconstructed, non-original rear wall for the required mechanical plant to reach the internal service cavities. The works will not alter the existing structural form or massing of the protected structure.

Land-use zoning

What this land is zoned for

Z14: Strategic Development and Regeneration Areas (SDRAs)RS
To seek the social, economic and physical development and/or regeneration of an area with mixed-use, of which residential would be the predominant use.

National zoning type: Residential, mixed residential and other uses

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
22 Barrow St, Ringsend, Dublin 4Jan 2026€685,00050 m
17 Shelbourne Village, Ringsend Rd, Dublin 4May 2026€381,00575 m
26 Shelbourne Village, Ringsend Rd, Dublin 4May 2026€440,00075 m
Building C Balconies Bolands Mills, Dublin 4Mar 2025€56,00090 m
Apartment 54, Shelbourne Village, Ringsend RoadJul 2025€415,00099 m
77 Shelbourne Village, Ringsend Rd, Dublin 4Mar 2026€378,00099 m
5 Gordon St, Dublin 4, DublinJun 2025€380,000100 m
91 The Westmoreland, Charlotte Quay, Dublin 4Mar 2025€315,000101 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received10 July 2026
  2. Decision due4 September 2026

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.