Planning Permission Ireland
Awaiting decisionApartmentsDecision was due 5 February 2026

The A1 Lands in the Pollbeg West Strategic Development Zone (SDZ) Planning Scheme, The wider site also includes the lands known as the Former Irish Glass Bottle & Fabrizia Sites, Poolbeg West, Dublin 4

Modifications to a permitted development in Poolbeg West to increase the number of apartments from 542 to 586.

WEBPWSDZ5859/25 · Dublin City Council · Lodged 2 December 2025

Reference
WEBPWSDZ5859/25
Authority
Dublin City Council
Register status
In progress
Type
Permission
Received
2 December 2025

Summary

AI-generated

The proposed development comprises modifications to a permitted mixed-use residential scheme. It seeks to reconfigure floor plans across Blocks D and E to increase the overall number of apartment units from 542 to 586.

Apartmentsapartmentssdzmodifications
Residential units
586

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Pembroke beach dac intend to apply for planning permission for development, comprising modifications to a permitted mixed-use residential development (referred to as 'phase 2'). The subject lands are c. 1.41 ha and are identified as being within the a1 lands in the poolbeg west strategic development zone (sdz) planning scheme (april 2019). The wider site also includes the lands known as the former irish glass bottle & fabrizia sites, poolbeg west, dublin
  • The proposed development comprises modifications to the permitted development (planning reference pwsdz3700/24, as amended by planning reference webpwsdz2596/24 and webpwsdz1571/25) to increase the overall number of permitted apartments from 542 no. Apartment units to 586 no. Apartment units, across block d (d1 and d2) and block e (e1, e2, and e2a). The proposed modifications consist of the: reconfiguration of floor plans to accommodate a revised mix of apartment types within blocks d and e (the permitted scheme comprises 542 no. Apartment units, consisting of 237 no. 1-bed, 257 no. 2-bed, and 48 no. 3-bed apartments; the proposed scheme comprises 586 no. Apartment units, consisting of 11 no. Studio, 257 no. 1-bed, 299 no. 2-bed, and 19 no. 3-bed apartments). Blocks d1, d2, e1, and e2 will increase by a cumulative total of c. 2,272 sq m gfa to accommodate the reconfigured floor plans; revisions to the floor areas of the ground floor uses including inter alia crèche, health centre, retail units, substations, and bin stores within blocks d and e, necessitated by the floor plan reconfigurations; revisions to the articulation of the facades of blocks d and e, including the relocation and resizing of windows and balconies to align with the reconfigured floor plans, changes to balcony materials to improve balcony variety (the permitted scheme comprises exclusively glass balustrade balconies; the proposed scheme introduces a mix of glass balustrade and metal railing balconies), and revisions to the colours of bricks and other materials used to articulate the facades; expansion of the basement by c. 2,583 sq m to the northwest to accommodate the parking requirements of the proposed increased quantum of units (the permitted basement gfa is c. 9,550 sq m; the proposed basement gfa is c. 12,133 sq m); revisions to basement floor levels to improve head heights and to facilitate connection to the basement of the adjacent hotel site (the basement's lowest floor level will remain 2.0 m od); provision of additional car and bicycle parking at basement level to accommodate the proposed increase quantum of units (the permitted basement comprises 129 no. Car parking spaces and 926 no. Cycle parking spaces; the proposed basement comprises 280 no. Car parking spaces and 955 no. Cycle parking spaces); revisions to the courtyard layouts of blocks d and e to accommodate the expansion of blocks d1 and e1, and to incorporate additional ventilation grilles necessitated by the ventilation requirements of the expanded basement area; revisions to the basement ramp access at podium-level on 'ouzel street' to facilitate clearance heights required for inter alia fire tender and refuse truck circulation; revisions to the roof terraces and roof level suds features within blocks d and e (the permitted scheme comprises 4,779 sq m of communal amenity space; the proposed scheme comprises 4,446 sq m; the scheme retains a provision above the minimum required by the apartment guidelines); omission of 2 no. Permitted single esb substations and associated lv switch rooms located in blocks e1 and e2a (one in e1 and one in e2a); relocation of the single esb substation and associated lv switch room, located centrally within block e2 and fronting 'glass bottle avenue', to the south-west corner of block e2, facing block e1. This includes the provision of substation access from 'glass bottle avenue', in part amending 'glass bottle avenue' as permitted under planning reference pwsdz3207/21 (as amended); revisions to the 'neighbourhood square' public realm to align with the adjacent permitted hotel (planning reference webpwsdz1571/25); omission of conditions 4, 5, and 6 of the final decision of planning reference pwsdz3700/24, relating to the scheme's 'build-to-rent' units (the proposed scheme does not comprise any 'build-to-rent' units per the definition as set out in the sustainable urban housing: design standards for new apartments, guidelines for planning authorities (march 2018)); and all other associated works above and below ground. A natura impact statement (nis) will be submitted to the planning authority with the application

Land-use zoning

What this land is zoned for

Z14: Strategic Development and Regeneration Areas (SDRAs)RS
To seek the social, economic and physical development and/or regeneration of an area with mixed-use, of which residential would be the predominant use.

National zoning type: Residential, mixed residential and other uses

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
12 Leukos Rd, Dublin 4, DublinMar 2026€607,000167 m
1 Bremen Road, Ringsend, DublinNov 2025€680,000236 m
45 Poolbeg Quay, Pigeon House Rd, Ringsend Dublin 4Feb 2026€410,000261 m
48 Poolbeg Quay, Ringsend, Dublin 4Jun 2026€440,000271 m
54 Poolbeg Quay Ringsend Dublin 4, Dublin 4, DublinNov 2025€375,000271 m
46 Bremen Rd, Ringsend Irishtown, Dublin 4Dec 2025€740,000271 m
42 Bremen Rd, Ringsend Dublin 4, DublinJun 2026€698,500286 m
32 Poolbeg Quay, Pigeon House Road, RingsendSept 2025€435,000298 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received2 December 2025
  2. Decision due5 February 2026

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.