Kilshane, Finglas, Dublin 11
Proposed 600 MW gas-fired peaking power generation station in Finglas.
SID/06/24 · Fingal County Council · Lodged 4 October 2024
- Reference
- SID/06/24
- Authority
- Fingal County Council
- Register status
- In progress
- Received
- 4 October 2024
Summary
AI-generatedKilshane Energy Ltd intends to apply to An Bord Pleanála for a peaking power generation station on a 14.42-hectare site in Finglas. The development will feature two Open Cycle Gas-Fired Turbines (OCGT) with a combined capacity of 600 MW, backup fuel storage, and supporting structures.
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
In accordance with section 37e of the planning and development act 2000 (as amended) kilshane energy ltd, gives notice of its intention to make an application for permission/approval to an bord pleanála in relation to the proposed development described below. The site is located at kilshane, finglas, dublin 11 and comprises an area of c. 14.42 hectares. The site is located to the south of kilshane road and the site of a permitted peaking power generation station permitted under fcc reg. Ref. : fw22a/0204 and abp ref. : 317480-23. The site is to the west of the m2 motorway, to the north of roadstone huntstown quarry, and to the east of agricultural lands and northwest logistics park. The proposed development involves the construction of a peaking power generation station comprising two open cycle gas-fired turbines (ocgt), each with a capacity of 300 mw (600 mw in total), along with backup fuel storage, supporting structures, and services. The development is divided into two distinct areas, comprising an energy generation compound and an ancillary compound. The energy generation compound will house two open cycle gas turbine (ocgt) sets and associated flues, with a maximum height of 44m. To the west of the turbine sets two air insulated substations (ais) compounds are proposed to house transformers and electrical equipment within fenced compounds (with a fence height of 3m, along with lightening protection masts 18m in height). Between the turbine sets it is proposed to provide a single storey peecc (power, electrical, and electronic control centre), with a gross floor area (gfa) of 72 sq. M. And an overall height of c. 2.7m. A cems (continuous emissions modelling shelter) is proposed to the southeast of the peecc, with a gfa of 13 sq. M. And an overall height of 2.7m. To the west of the turbine sets, 6 no. Fan cooler systems are proposed, each with an overall height of 4m. The energy generation compound will be bound to its northern and part of its eastern boundary by acoustic fencing c. 12m in height. The ancillary compound, located to the west of the energy generation compound, will accommodate a backup fuel tank (with height of 16.2m), a demineralised water tank (with a height of 16.2m), a raw / fire water tank (with a height of 15.3m), a single storey fire pump house building (with a gfa of 34 sq. M. And an overall height of 2.7m). 2 no. Demineralised water treatment trailers (with an internal area of 82 sq. M. And an overall height of c. 4m) will be accommodated to the southeast of the ancillary compound. The development includes access arrangements (connecting with the permitted development permitted under fcc reg. Ref. : fw22a/0204 and abp ref. : 317480-23 to the north), surface treatments, services, landscaping, attenuation areas, internal circulation roads, and all associated and ancillary works. An epa-industrial emissions directive (ie) licence will be applied for to facilitate the operation of the proposed development. An environmental impact assessment report (‘eiar’) will be submitted with the application. Abp ref: abp-321017-24 www. Kilshanegenerationsid. Com
Key dates
Timeline
- Application received4 October 2024
- Decision due19 December 2024
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedEnergy
The proposed development will consist of the following — The construction of a new Gas Turbine Power…
Kilshane Road, Kilshane, Finglas, Dublin 11.
FW22A/0204FingalLodged 3 May 2023
- GrantedEnergy
Kilshane Energy Ltd. intends to apply for planning permission for revisions to previously approved Gas…
Kilshane Road, Kilshane, Finglas, Dublin 11
FW25A/0523EFingalLodged 28 Nov 2025
- WithdrawnEnergy
Pam Energy Supplies Limited, intend to apply to the aforementioned Planning Authority for permission for…
Lands at Kilshane Road, Kilshane, Finglas, Dublin 11
FW23A/0232FingalLodged 8 Aug 2023
- Awaiting decisionEnergy
The proposed development will comprise the following: Construction/ installation of an Open Cycle Gas Turbine…
Huntstown Power Station, Townlands of Kilshane, Huntstown and Johnstown, Dublin, D11 N406
FW26A/0163EFingalLodged 22 Apr 2026
- GrantedEnergy
A 208MW (electrical output) Open Cycle Gas Turbine (OCGT) Power Plant & comprises the following elements: a)…
Carranstown & Caulstown , Platin , Duleek Co. Meath
LB190031MeathLodged 17 Jan 2019
- Awaiting decisionEnergy
The proposed development will comprise a 208MW (electrical output) Open Cycle Gas Turbine (OCGT) Power Plant…
Carranstown & Caulstown , Platin , Duleek Co. Meath
LB181494MeathLodged 13 Dec 2018
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.