Planning Permission Ireland
Awaiting decisionEnergy

BALLYNAGARE DYSERT MARSHES FARRANDEEN MONUMENT, KNOCKAUNACURRAHEEN BALLINTOGHER BALLNAGERAGH CLOONCOLLA BALLYHORGAN WEST BALLYHORGAN EAST LISSAHANE KNOCKBURRANE, BALLYGARRET BANEMORE AND PALLAS

Construction of a wind farm with 7 wind turbines, a meteorological mast, and a substation.

211338 · Kerry County Council · Lodged 24 November 2021

Reference
211338
Authority
Kerry County Council
Register status
Withdrawn
Type
PERMISSION
Received
24 November 2021

Summary

AI-generated

The development proposes 7 wind turbines with a maximum tip height of 170m, a permanent 110m meteorological mast, and a 38 kV substation. It also includes road upgrades, temporary construction compounds, a borrow pit, and underground cabling to connect to the existing Clahane substation.

Energywind farmrenewable energyinfrastructure

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Construct 7 no. Wind turbines with the following maximum and minimum parameters: overall ground to blade tip height in the range of 170m maximum to 169.5m minimum o hub height of 95m o rotor diameter in the range of 150 maximum to 149m minimum. Turbine hardstad areas. Provision of 1 no. Permanent meteorological mast with a height of 110 metres. Upgrade of existing roads and access junctions. Provision of new site entrances, roads and hardstand areas. 2 no. Temporary peat storage areas. 2 no. Temporary construction compounds. 1 no. Borrow pit. All site drainage works. 1 no onsite 38 kv substation, control building and plant, associated security fencing and wastewater holding tank. All associated underground electrical and communication cabling connecting the turbines to the proposed on-site substation. Connection of the proposed 38 kv on-stie substation via underground cable in the public road to the entrance of the existing clahane 110 kv substation in teh townland of pallas. All ancillary stie and ground works, apparatus and signage. The application is seeking a ten year planning permission and 35 year operational life from the date of commissioning of the windfarm. The application is accompanied bya natura impact statement (nis) and environmental impact assessment report (eiar)

Key dates

Timeline

  1. Application received24 November 2021
  2. Application withdrawn9 December 2021

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.