Planning Permission Ireland
GrantedCommercialDecided 23 November 2021

Collinstown Leixlip Blakestown Kellystown Collinstown Industrial Park, Leixlip, Co. Kildare.

Extensions to the existing cafeteria and corridor at Collinstown Industrial Park.

211398 · Kildare County Council · Lodged 29 September 2021

Reference
211398
Authority
Kildare County Council
Register status
Decided
Type
PERMISSION
Received
29 September 2021

Summary

AI-generated

The development consists of a single-storey extension to the west side of the existing IR2 cafeteria to increase seating capacity. It also includes a single-storey corridor extension to the south side to accommodate a new corridor and entrance lobby.

Commercialindustrial parkextensioncafeteria
Storey
1
Floor area
350 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

For (1) ir2 cafeteria extension. A single storey extension to the west side of the existing ir2 cafeteria with glazed west, elevation increasing the capacity of the existing cafeteria seating, sized approximately 65 square metres and approximately 6.2 metres high. (2) ir2 corridor extension. A single storey extension to the south side of the existing ir2 cafeteria with glazed south elevation, accommodating a new corridor within ir2 and a new entranced lobby, sized approximately 285 square metres and approximately 6.2 metres high. (3) site works. The proposed development utilises existing roads, paths, fencing, site lighting, signage, landscaping and includes miscellaneous siteworks

Land-use zoning

What this land is zoned for

Industry and WarehousingBP
To provide for industry, manufacturing, distribution and warehousing.

National zoning type: Mixed/general commercial/industrial/enterprise uses

Objective set by the Leixlip LAP 2020-2023 (2020–2026). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Key dates

Timeline

  1. Application received29 September 2021
  2. Decision due23 November 2021
  3. Decision issued23 November 2021
  4. Grant issued10 January 2022
  5. Permission expiry9 January 2027

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.