Construction of a solar farm spanning 60.36 hectares across counties Kildare and Laois.

2561233 · Kildare County Council · Lodged 29 October 2025

Reference
2561233
Authority
Kildare County Council
Register status
Invalid or incomplete
Type
PERMISSION
Received
29 October 2025

Summary

AI-generated

The development will consist of linear arrays of ground-mounted solar PV panels on steel structures. It includes four single-storey inverter stations, a control and switch gear room, security fencing, CCTV, and two new site entrances.

Energysolarrenewablesinfrastructure
Storey
1

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Red iii application - linear arrays of solar pv panels on ground mounted steel supported structures with associated cabling and ducting; 4 no. Proposed single storey inverter stations; all associated underground cabling (within and between land parcels), including onsite control and switch gear room; site perimeter fencing; 2 no. New site entrances with palisade double security gates; 2 no. Temporary construction compound/carpark/material storage areas with associated temporary site offices, parking areas and security fencing; 3 no. Temporary and 1 no. Permanent steel storage containers; site access tracks including passing and turning bays; on-site pole mounted cctv cameras; 2 no. Bottomless culverts; 2 no. Temporary construction stage moby dick type wheel wash systems; 1 no. Concrete wash out location (within the westernmost temporary construction compound); and all associated and ancillary works. The proposed solar farm development spans a total site area measuring 60.36 ha, of which 37.66 ha is located in co. Kildare and 22.7 ha is located in co. Laois. Permission is sought for a period of 10 years with an operational period of 40 years. The total capacity of solar pv on the site is estimated to be 32 mw.

Key dates

Timeline

  1. Application received29 October 2025

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.