Awaiting decisionInfrastructureDecision was due 14 October 2025

An Garda Síochána, Mountjoy Garda Station, 399, North Circular Road, Dublin 7

Universal access works including a new entrance and platform lift at Mountjoy Garda Station.

3355/25 · Dublin City Council · Lodged 19 August 2025

Reference
3355/25
Authority
Dublin City Council
Register status
In progress
Type
State Authority Works
Received
19 August 2025

Summary

AI-generated

The Commissioners of Public Works propose accessibility upgrades at Mountjoy Garda Station. The works include constructing a new accessible entrance with stairs and a platform lift, replacing a basement-to-street staircase, and relocating an existing wrought iron gate.

Infrastructuregarda stationaccessibilitypublic works

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Saw: part 9 planning and development regulations 2001 s. I. 600/2001 the commissioners of public works in ireland, on behalf of an garda síochána, in accordance with part ix of s. I. No. 600/2001, local government and development regulations 2001 (as amended) give notice that they propose to carry out the following works at mountjoy garda station, 399 north circular road, phibsborough, dublin
  • Universal access works at mountjoy garda station the proposed development will comprise the construction of a new accessible entrance within the curtilage of mountjoy garda station site, to the east of the existing garda station, in order to accommodate a new accessible entrance with new access stairs and platform lift. Works will also include the replacement of an existing stair linking basement to street level. Associated site works include establishing surface water collection from the proposed roof areas, the removal of a small section of railing to accommodate an accessible entrance, and the relocation of the existing wrought iron gate at the entrance to the footpath level. An appropriate assessment screening was undertaken for the proposed development. It concluded that there will be no likely significant effects on any natura 2000 sites, either alone or a combination with, any other plans or projects. A preliminary examination for environmental impact assessment was undertaken for the proposed development. It concluded that having regard to the nature, scale and location of the proposed project, eia screening is not required. Any person may, within 4 weeks from the date of this notice, apply to an bord pleanála for a screening determination as to whether the development would be likely to have significant effects on the environment. The above mentioned screening may be inspected at the following website: https://www. Gov. Ie/en/consultations/ drawings and particulars of the proposed development will be available for inspection by appointment only and with two working days' notice, between 9.30am and 12.30 pm and between 2.30pm and 5.00pm, monday to friday for a period of 6 weeks beginning on the date of the publication of this notice at: the offices of the state authority, the commissioners of public works in ireland, headquarters, property maintenance services section, jonathan swift street, trim, co. Meath, c15 nx36 dublin north region architectural services, the red house, collins barracks, dublin 7, d07 k850 appointment requests should be sent to gardamaintenance@opw. Ie or telephone 046 942 2000. Written submisssions or observations with respect to the proposed development, dealing with the proper planning and development of the area in which the development is situated, may be made in writing within a period of 6 weeks beginning on the date of publication of this notice to the email address above or to: the office of public works, property maintenance services, head office, jonathan swift street, trim, co. Meath, c15 nx36

Land-use zoning

What this land is zoned for

Z15: Community and Social InfrastructureCI
To protect and provide for community uses and social infrastructure.

National zoning type: Mixed/general community services/facilities uses

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
7 Glengarriff Parade, North Circular Rd, Dublin 7Nov 2025€875,00058 m
11 Glengariff Parade, Glasnevin, Dublin 11Nov 2025€420,00063 m
13 Glengarriff Parade, Phibsborough, Dublin 7Feb 2026€475,00066 m
21 Glengarriff Parade, North Circular Rd, Dublin 7Oct 2025€540,00079 m
29 Glengarriffe Parade, North Circular Rd, Dublin 7Jun 2025€615,00097 m
4 Killarney Parade, PhibsboroughDec 2025€450,000120 m
47 Inishfallen Parade, Phibsboro, Dublin 7Aug 2025€557,500144 m
2 Muckross Parade, Circular Rd North, Dublin 7Jan 2025€270,000155 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received19 August 2025
  2. Decision due14 October 2025

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.