Planning Permission Ireland
GrantedEnergyDecided 12 November 2020

KILPADDOGE, TARBERT, CO KERRY

Grid-charging modifications to a permitted battery energy storage system in Tarbert.

20850 · Kerry County Council · Lodged 18 September 2020

Reference
20850
Authority
Kerry County Council
Register status
Decided
Type
PERMISSION
Received
18 September 2020

Summary

AI-generated

This application proposes changes to a previously permitted peaker power plant. It seeks to change the energy source for charging the Battery Energy Storage System (BESS) from diesel to the national grid, modify the electrical layout, and add a small metering enclosure.

Energyenergybattery storagegrid

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

For changes to the previously permitted peaker power plant development (planning ref. 13/138). It is proposed to change the energy source for the charging of the battery energy storage system (bess) containers from diesel to charging off the national grid and to change the permitted layout for electrical equipment based on the consequence of the proposed change in energy source at an area located within the permitted development. It is also proposed to include a small metering enclosure adjacent to the constructed substation building within the permitted development. A five year planning permission is being sought for the proposed development

Key dates

Timeline

  1. Application received18 September 2020
  2. Decision due12 November 2020
  3. Decision issued12 November 2020
  4. Grant issued16 December 2020
  5. Permission expiry15 December 2025

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.