Skip to content
Planning Permission Ireland

Move In and Maintain — Year 1, Year 5 and Year 10 Checks

Last updated 30/6/2026 · Reviewed 30/6/2026
On this page

The first 12 months shake things down. Year 5 catches latent defects. Year 10 is structural check and major maintenance.

[@portabletext/react] Unknown block type "span", specify a component for it in the `components.types` prop

When this matters most

You've just taken handover and want a schedule that prevents year-30 surprises.

When this doesn't apply

You're still in snag. Defer until after practical completion.

Frequently asked questions

How often should I pump a septic tank?

Every 2–3 years for a domestic tank. Treatment plants need annual servicing.

What does MVHR maintenance look like?

Filter swap every 12–18 months (DIY, 30 minutes). Full service every 3–5 years (professional, €250–€400).

When does the heat pump need servicing?

First service at year 1, then every 2 years. Service cost €150–€300 each.

Should I get a BER re-assessment?

Useful at year 10 to compare actual to design. Costs €200–€400. Helps catch performance drift on airtightness or insulation.

Sources

SEAI, Maintenance guides for air-to-water heat pumps. https://www.seai.ie/

EPA, Domestic wastewater maintenance guidance. https://www.epa.ie/

Frequently asked questions

How often should I pump a septic tank?

Every 2–3 years for a domestic tank. Treatment plants need annual servicing.

What does MVHR maintenance look like?

Filter swap every 12–18 months (DIY, 30 minutes). Full service every 3–5 years (professional, €250–€400).

When does the heat pump need servicing?

First service at year 1, then every 2 years. Service cost €150–€300 each.

Should I get a BER re-assessment?

Useful at year 10 to compare actual to design. Costs €200–€400. Helps catch performance drift on airtightness or insulation.

When this matters most

You've just taken handover and want a schedule that prevents year-30 surprises.

When this doesn't apply

You're still in snag. Defer until after practical completion.

Briefs in this stage

8 in-depth answers for this stage of the build. Pick the one that matches your question.

Where to go next

Free pre-planning reportCheck a site before you apply
Map of applicationsEvery application on one map, with zoning and heritage layers
AreasCounties and towns
Planning statisticsThe national picture, and every council side by side
CommencementsWhat actually got built
Property salesWhat it sold for
Ask the planning assistantPlain-English questions