Planning Permission Ireland

Move In and Maintain — Year 1, Year 5 and Year 10 Checks

Last updated 30/6/2026 · Reviewed 30/6/2026
On this page

The first 12 months shake things down. Year 5 catches latent defects. Year 10 is structural check and major maintenance.

[@portabletext/react] Unknown block type "span", specify a component for it in the `components.types` prop

When this matters most

You've just taken handover and want a schedule that prevents year-30 surprises.

When this doesn't apply

You're still in snag. Defer until after practical completion.

Frequently asked questions

How often should I pump a septic tank?

Every 2–3 years for a domestic tank. Treatment plants need annual servicing.

What does MVHR maintenance look like?

Filter swap every 12–18 months (DIY, 30 minutes). Full service every 3–5 years (professional, €250–€400).

When does the heat pump need servicing?

First service at year 1, then every 2 years. Service cost €150–€300 each.

Should I get a BER re-assessment?

Useful at year 10 to compare actual to design. Costs €200–€400. Helps catch performance drift on airtightness or insulation.

Sources

SEAI, Maintenance guides for air-to-water heat pumps. https://www.seai.ie/

EPA, Domestic wastewater maintenance guidance. https://www.epa.ie/

Frequently asked questions

How often should I pump a septic tank?

Every 2–3 years for a domestic tank. Treatment plants need annual servicing.

What does MVHR maintenance look like?

Filter swap every 12–18 months (DIY, 30 minutes). Full service every 3–5 years (professional, €250–€400).

When does the heat pump need servicing?

First service at year 1, then every 2 years. Service cost €150–€300 each.

Should I get a BER re-assessment?

Useful at year 10 to compare actual to design. Costs €200–€400. Helps catch performance drift on airtightness or insulation.

When this matters most

You've just taken handover and want a schedule that prevents year-30 surprises.

When this doesn't apply

You're still in snag. Defer until after practical completion.

Briefs in this stage

8 in-depth answers for this stage of the build. Pick the one that matches your question.

Where to go next